Jump to content
 

long island jack

Members
  • Posts

    2,666
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by long island jack

  1. track plan sorted

    4 rail served industries in black,a push back siding back to fiddle yard to serve as another industry,

    a small hold up siding partly disused, cobbled road and loading area,tall 3 storey buildings.

     

    post-13979-0-41505700-1324323570_thumb.jpg

     

    roadbed will be 3mm cork, with 3mm ply where it crosses the baseboard joints which will have brass screw for soldering the track to (from the days be for the darkside)

     

    post-13979-0-74442700-1324324099_thumb.jpg

     

    post-13979-0-99894200-1324324138_thumb.jpg

     

    hole cut for access to fiddle yard

     

    post-13979-0-43727800-1324324772_thumb.jpg

     

    post-13979-0-00384200-1324324800_thumb.jpg

     

    post-13979-0-80918000-1324324826_thumb.jpg

     

    soon we can lay some track

    • Like 1
  2. boards finnished, just front pelmet and trim to do, after track plan and building locations are sorted.

     

    post-13979-0-15563200-1324249927_thumb.jpg

     

    always like the look of the railroads in and around new york especially long island

    the layout is not going to be based on any particular location

    my idea is to build a switching layout which i can change location by changing loco's and stock

    i've been collecting items from the following railroads for a while

    LIRR

    CNJ

    NYC

    PC,

    PRR

    CONRAIL

    NY DOCK

    post-13979-0-07004300-1324253047_thumb.jpg

     

    llir s1 picture on helm leasing

     

    worked out i will probably need 3 loco's and about 20 freight cars to run it per railroad though so of the freight car can inter-mix with each other depending on date its modeled

    track plan will be pretty simple, runround 4 or 5 sidings, maximum train length will be loco + 4-5 cars+caboose,one man operation, dcc control+points

    track will be what ever there is in my "whats left of other project box" which happens to be

    2 3way

    3 left hand

    2 right hand

    all peco code 100 electofrog

    need to get my track templates and lining paper and make a full size plan.

  3. point take about foamcore tryed it once with a small layout,but with all the lifting in and out of the car for shows it didn't take the knocks as well as timber.

     

    post-13979-0-67434200-1324111668_thumb.jpg

     

    post-13979-0-09156400-1324111697_thumb.jpg

     

    these boards are only 4x 15in you can pick them up with one hand

     

    post-13979-0-61361600-1324111723_thumb.jpg

     

    post-13979-0-55720700-1324111752_thumb.jpg

     

    i'm still at bit of old school for my baseboards,with ply tops instead of chipboard "HELM" was built to a similar fashion and there standing up to all the moving about, especially up and down the loft ladder where it's stored

    • Like 1
×
×
  • Create New...