Jump to content
 

jazz

Members
  • Posts

    3,290
  • Joined

  • Last visited

Posts posted by jazz

  1. A bit more progress on the County today. Surprising for a Scorpio kit, the boiler/smokebox took a fair bit of time to get it to sit properly. When rolled and soldered anlong the half etched seam the front and rear edges were way off verticle. Anyway, I finally got it all right in the end. I bolted the firebix to the cab front and drilled from beneath the footplate and through the bottom of the s/box. Then solders an 8BA nut over the hole in the s/box and secred with an 8BA bolt. I will probably solder the wole unit to the footplate before painting anyway.

     

    The rest of the body should now fly along. Tomorrow is another day.

     

    DSC03129.jpg

    • Like 1
  2. 'Morning guys.

     

    Ian, yes that should be a rectangular filler, thanks for noticing it. The kit does have both types included.

     

    Pete & Rick. I have always used regular Halfords grey primer with great results. Models I have painted many decades ago that have had heavy use are still in great shape.

     

    Hi Mike. The hip is coming along very nicely. Just come back from a week in Kernow enjoying some cliff top walks, so can't be bad.

     

    Regards to all Ken

  3. :rolleyes: Happy to say I have now got a full handle on the new forum. Here are some photos of the GWR County build. (I started this build whist the chageover of the forum was under way and did not take photos from the start.)

     

    Anyway this is the Scorpio kit. I am very fond of these kits as they are very well detailed and assemble with little trouble.

     

    I have not completed the chassis as painting it will be easier in this state. Completion will require very little addition painting. I do not bother with springing on the bogies now. I find packing with loads of hidden lead works MUCH better. An added bonus is not having to spend time adjusting springs to get a good ride. The bolt Scorpio give for a centre post for the bogie works much better with a brass tube sleeve over it. The thread tends to bind in the bogie slot otherwise.

     

    DSC03123.jpg

     

    The bodywork has gone well today. I add as much detail as posible before making up and fitting the firebox/boiler/smokebox unit. A dislike trying to add detail when the body is almost complete. Much easier doing this way. I have installed the Scorpio compensation beam on the rear two axles. Doing this meant I could not fit the cast internal axle journals. It is not noticeable when the body is fitted. There is room for the Gladiator pickups on all the drivers.

     

    DSC03124.jpg

     

    The tender I have already completed. I have used my usual piano wire springing for the centre axle.

     

    DSC03126.jpg

    • Like 2
  4.  

    Hi all back to the workbench after a nice break in Kernow. I have the cute Park tank loco all ready for despatch. Here she in primer.

     

    This is the Javelin kit. Very nice to assemble. I like it so much one is on order for my line.

     

    Although a NLR tank they ended up all over the place including Shropshire so just right for an excuse to be seen on P y Cwm branch.

     

    DSC03120-1.jpg

    post-150-0-47686400-1379535544_thumb.jpg

    • Like 1
×
×
  • Create New...