Jump to content
 

Chawn Park

Members
  • Posts

    66
  • Joined

  • Last visited

Everything posted by Chawn Park

  1. Close coupled old Graham Farish 158 DMUs A few photos of the Graham Farish 158 DMUs modified as per last posted information. Below the DMU departs platform 2 at Chawn Park Below further along the upper main track passing the first of the steelworks buildings.
  2. Mind the Gap ! Close coupling old Graham Farish DMUs Trying to improve the appearance of some very old Graham Farish models I found the following simple solution after making a few experiments with different options. My N Scale Chawn Park layout has some very tight curves with radius of around only 229mm ( 9 inch ) but I wished to close the gap between the coaches to the minimum that would still allow reliable operation on such tight radius curves. Below photo shows one of the converted units standing at platform 4 on my layout. Below photos shows how the standard Rapido coupling system was modified. First remove the bogies from each car. Then cut off the Rapido coupling hook part from the coupling molding just leaving the main arm. See photos. On the reaming arm I drilled a small hole into which a fine wire can be inserted to form a link to the next coupling. The coupling link is simply a bent U shaped piece of wire. The gap between cars is determined by the size of the U shaped wire link. I experimented with different lengths / gaps between cars to find the minimum that would still allow reliable operation around my very tight curves and operate through crossings, meaning for example left and right hand points mounted back to back forming crossover between tracks. Remember when testing try both directions of travel, since I found a slight difference in results between pulling and pushing. With this system I found it best just to place a "pair of coupled bogies" on the track, then drop the car body onto the bogies, since handling a pre-coupled unit without damaging the fine wire link is not easy with a two car set and almost impossible with a 4 car or more unit. Below, a example of the adjusted gap between cars. Increasing the diameter of the main central bogie pivot hole just a small amount ensures free rotation of the bogies on curves and points and is recommended when running with just the body weight holding everything in place. Get everything correct and you can obtain reliable operation with reduced gaps between cars. For the powered car it is slightly different, since you cannot just drop the body onto a removed bogie. With the powered cars I cut away the Rapido hook and drilled hole in exact same way but the wire connecting hook needs to remain in place connected to the power car and is simply hooked into the corresponding loose bogie of the next car. On some Graham Farish bogies I added a small amount of tape ( I just used some black electrical insulation tape ) to cover any slots or holes into which the wire coupling arm may snag. Thin plastic card or other methods would also work, the trick is just to block any locations where the wire link may snag and jam. I made the cover wider than just the Farish moulding to ensure the coupling wire arm cannot snag when it swings wider than the base moulding and catch on the top edges. It has been a few years since I close coupled the first of these DMUs and I have been surprised the electric tape used has remained in place, I was expecting to need to glue a plastic cover strip into this location. Maybe the only negative with this simple solution is that a different method is used when handling trains on and off the track. In my case the stock is hardly ever removed from the layout, only for servicing or repairs thus I find this acceptable. The weight of each car has found to be sufficient to hold everything in place during operation.
  3. Nightlife, around Chawn Park station A few different photos today, away from the trains, a look around the area close to the main station building. First photo is a view along high street. On the right hand side are the buildings forming Chawn Park station. Outside a couple of travellers wait near the bus stop. The traffic in the background and complex arrangement of buildings all combine to build the scene representing a typical large town center. All buildings are illuminated and the interior detail of the station self service cafe can be seen through the windows on the right hand side of this image. The use of yellow LEDs to light the station cafe help create the night time atmosphere. Outside the station building the road sign is illuminated with SMD LEDS, the two posts supporting the sign are made from thin copper wire thus also provide needed connections and avoid need for separate wires. The ambulance on the left is a standard Oxford Diecast model but is fitted with working flashing blue lights. On my long list of ideas to further develop the model is the task of adding working head / tail lights to the cars, at least to the ones that are not parked. Below another view along the front of the station buildings. The postal sorting building is at the far end of this complex, with van loading bays in the yard behind adjoining the railway. The same travellers are still waiting by the bus stops, looks like the bus service is not that frequent since they have been standing here for a few years now ! The next photo is a view of the pedestrian crossing directly outside the main station entrance. More of the illuminated shop windows can be seen in the background of this photo. The shop window displays are on different circuits to lights in rooms on upper floors, thus the lighting effect can be changed to suit different times during the day. Most of the street signs are just short lengths of copper wire fitted with signs simply cut from photo prints. These may not be the best models of street furniture but I find it is more important that the scene looks complete. The clock in the middle of the crossing needs a resistor adding into its circuit to reduce the brightness. Directly opposite the pedestrian crossing I have modelled a branch of Woolworths, every town center seemed to have a branch of Woolworths during the period modelled. Next a close up photo showing the side elevation of Woolworths. The side street has a slope which makes model building construction more difficult but I think the final result is better than a flat baseboard. This section of buildings lifts up to allow access to the tracks below. A small gap can sometimes be seen between the street level and pavement due to bending of the models baseplate which has occurred over time. Note the detailed Woolworths shop windows ( which are fitted with working LED lights ) these window displays are just parts cut from photos and a few figures added representing a clothing display, so quite quick to model. The wall lights each side the main entrance door work, plus I have a working flashing red light on the very small alarm box. This is simply a small fiber optic cable bringing light from a red LED hidden in the building. Outside on the pavement the post box is a white-metal casting, painted and detailed. Below. I added a pound coin in this photo to confirm small size. Maybe this represents a later time period when Poundland started to move into some of the old Woolworths buildings on the typical high street ! Another view showing the Woolworths building. The gap between pavement needs attention, this is due to the buildings base not being totally flat but I cannot glue the assembly in place since I remove this set of building to access tracks below. I need to invent a better hold system for this group of buildings, maybe use of magnets? For now the parked cars help to hind the gap. A slightly different view of the main street with more of the illuminated shop fronts forming the background. Below photo. From the opposite side of high street looking back towards the station entrance. The moped rider needs to take care when the van turns right. Road works in the left hand hand land are resulting in some traffic flow issues. Below photo Same area as previous photo from a higher viewpoint, the lights in Woolworths are now off so the store is closed, but rooms in the upper floors are illuminated. Over the crossing the station entrance is illuminated. A view inside the station self service cafe, as seen from the outside on the first photo. This is simply modelled from a few scraps of card. It is 25 years since this model station was build so I assume the food must be past the sell by dates ! Below photo. On the other side of the main station building, stairways leading down to the platform buildings on the lower level, these are illuminated and have been shown in previous photos I have posted. However note how the platforms continue under the main building allowing long trains to be accommodated. These sections of platform under the main building are normally illuminated at all times the layout is operated. Remember this is N Scale so most of the defects seen in the photos are hardly noticeable to me when I am operating the layout, I am still adding to the layout and most important enjoying it. Anyway I hope this little look at another part of my layout may be of interest. Vic
  4. Rain during most of today here in the Midlands resulted in the opportunity to spend some time running Chawn Park. Disappointing start to todays operations, one of the automatic fiddle yards was not reliable in operation, after investigation a dry joint was found on a point motor connection. Re-soldering the joint quickly solved the issue. The point motor in question was installed over 25 years ago, I think the original solder flux used may have resulted in long slow corrosion of the connection. Credit to these simple Peco point motors, they are reliable in operation when correctly installed and adjusted. In all these years I have not needed to replace a point motor and only one Peco point has failed over the many years this layout as existed. After sorting the point motor, I left the layout running in automatic mode for several hours. No derailments, no failed locos all worked well. So I am very pleased the layout and stock can be reliable in automatic mode. Leaving the layout running in automatic mode allows me to enjoy the layout whilst progressing other work on the layout. A few photos attached, enjoy. Vic
  5. Freight on Chawn Park Below a few photos of a selection of freight train movements. The ARC Amey Roadstone train was placed in the loop to allow another service to pass. Here is the train which passed, following this movement the stone train held in the loop regained access the main line. On the higher level train of cargo twins rolls through Chawn Park station. Back on the lower level, the main line is clear again allowing an 08 shunter to run around a train of tube wagons which it just moved into the loop alongside the main line. Finally a pair of 08 shunters leave, back to refuelling point in next town.
  6. New retaining walls and cutting. Another photo of the layout section with the recently fitted retaining walls. This part of the layout is still work in progress. It is not often I take photos from the back of the layout, maybe I need to obtain a background print to use when taking such photos. Finally in this quick post, photo of pair of 08`s passing through the area shown in first photo.
  7. N Scale Ballasting. Thanks for the comment about ballasting, according to my records the track was ballasted over 25 years ago! I found I still have some spare bags, see photo below. Ballast is by Green Scene, 2mm ballast, code GS1 408 Light grey. According to a quick internet search this product is still available. Ballast was laid dry, spread with care between sleepers, light misted with water a few times until it became quite wet. If you do not take care at this stage, building up the misting in steps the ballast will move resulting in more work to clean it up later. When quite wet then a PVA water mix was added and allowed to dry. After this I added another PVA water mix to ensure ballast is really solid. Even after extreme care with pre-misting and light application of PVA / Water mix, some of the ballast always seems to move, thus a lot of time was spent scraping and cleaning. Largest error I made was not to spray the Peco track sleepers before ballasting, but being my first ever model railway I made many errors, thus I have long list of things I would do differently "next time". The sleepers look very plastic so weathering the track is on the to do list. I found a couple of photos showing the track just after ballasting and before I cleaned and smoothed it. Quality of my camera was not so good all those years ago, but the old photos do show some details of the baseboard construction which is mainly using birch plywood. I remember construction was delayed since the Peco code 55 track which I have used was available quite some time before the points, so I waited a long time before trackwork could be finished.
  8. New section about construction of Chawn Park layout just posted in the Chawn Park Building's section informing about the new retaining walls and tunnel entrance at right hand end of the layout. See below for location of post. Click on top right hand arrow below to follow link to the information posted.
  9. RETAINING WALLS. New constructions on Chawn Park N Scale model railway. Development of Chawn Park model railway continues, the right hand end of layout is not often shown in photographs posted on this site due to need to finish construction. After long delay I am able to report some further progress. To hide the exit of the tracks at the right hand end of the layout and place the very tight 180 deg curves out of normal viewing, both pairs of main lines enter tunnels. Along the approach to these tunnels surrounding ground level rises thus a tapered retaining wall is needed. Below photo shows the area being developed. To speed up the construction I selected items from the Metcalfe Models card kit range. Tunnel entrance and retaining walls are constructed from standard Metcalfe parts, these have been simply adapted to fit the space. Below the start of the process, assembly of the Metcalfe wall away from the layout. A template with the profile of the retaining wall was marked out on thin cardboard, this template will also act as a backing plate to join the various Metcalfe sections into a single structure. I needed more height than the standard parts in the kit, thus the wall will be extended according to the design sketched in pencil using scraps from unused kit parts. Below after adding the extra height and some weathering. All edges of the cardboard parts have been painted to hind the white edges. Next step before installing the wall was to construct a drainage culvert for the tunnel and cutting. It is not easy to even see the bottom of the cutting, but I still thought it would add to the model since I make every effort to avoid the flat baseboard effect. Below photo shows the culvert which runs alongside the tracks, the tall retaining wall shown above will be fitted later on the right hand side. The low wall is being held in place by the two temporary card spacers allowing glue to dry. Water was added later after these photos using two part epoxy resin. Below a photo after installing the wall. Sorry I did not get the lighting correct when I took this photo but it shows the arrangement of all the walls, the different ground levels and the location of the culvert in base of cutting. Still more details need to be added but this part of the layout now looks much more acceptable than the open wooden baseboards. To finish this post, a view from front of layout ( Sorry just noticed foreground is out of focus ). This view through the trees with the top of the retaining wall forming the boundary of the railway shows how many different levels exist in this area. In the background my model of the steelworks buildings. A am sure more photos will follow as layout development continues. Enjoy Vic
  10. Steelworks traffic. N Scale Also a few photos of some freight train movements featuring the same pair of class 37 shown in other recent posts. With every photo I see need to improve the details, but that is the fun of developing a layout. Vic
  11. NSE in N Scale. Running night on Chawn Park with NSE stock. A selection of photos taken at various locations around my layout. Enjoy Vic
  12. Photo showing two old Graham Farish class 47 locos. These have been running on my Chawn Park model railway for many years, several gears failed and needed replacement, but after replacement of broken gears these old locos still run fine even at very low speeds. No working lights on these old models, no DCC control or sound, but I still operate them. They have just received a quick wheel and pick-ups clean and have been running today. It is only when they are placed next to more recent GF models then they show how the quality of ready to run models have advanced over the years that I have been developing and enjoying my layout. Well done and thank you to the team at Graham Farish. Vic
  13. A few new photos, tonight the track gang are out working on the exchange sidings
  14. Model Trees Found a new supplier for model trees at the Warley National show this weekend, Primo Models https://primomodels.co.uk/ It was nice to meet a new supplier, they were very helpful and I wish them success. The trees are very nicely made and individually packed in nice cardboard boxes which give good protection to all the fragile branches and foliage. I have just been experimenting placing a nice pine tree amongst some of my existing trees. A few photos are attached. The tall pine between the two main lines is the new addition. I also placed one along the front of the layout, I am not yet totally sure where I fill finally plant it, I will wait and test a few more ideas to fine tune what works best before final planting ( glue to baseboard ) This new pine tree is is quite tall but correct size for N gauge, using good section of tree height gives a greater impression of depth and distance. I have noted a lot of layouts with very small trees but I think getting the height of trees at realistic levels helps the overall image of a layout. I understand they do block the view of trains but are also useful for blocking parts of a layout you wish to hide. I have several other which I purchased which will be planted soon ! Enjoy Vic
  15. Graham Farish 47/7 47745 "Royal London Soc. For The Blind" Weekend visit to Warley National Exhibition in Birmingham resulted in the purchase of another class 47. Locomotive purchased was Graham Farish. class 47/7 47745 'Royal London Soc. For The Blind' Rail Express Syst. I have just taken it out of the box to check that it works. All is good, locomotive runs very smooth and quite in both directions, first impressions are another impressive GF product with high quality paint finish and amazing details. I have a rake of 8 parcels coaches in RES Red livery that I picked up second hand at another exhibition this year, these need a little clean up and some weathering but now I have a locomotive maybe this train will get some attention this winter. Attached are a few quick photos. Vic
  16. Class 37 double headed steel trains. Inspired by the class 37 double heading photos, last night I tried to run a similar train on Chawn Park. Attached some photos of the results with 37502 running together with 37506. 37506 is also a standard GF Model, this one is straight our of the box without any modifications or extra detailing. The BDAs forming the train are also straight out of the box, stanchion rails or steel load not yet fitted, these details will be added at some point. I just used these to make a quick train for these photos. In the process of track cleaning ready for this winters running. Vic
  17. Class 37 double headed steel trains. Inspired by the class 37 double heading photos, last night I tried to run a similar train on Chawn Park. Attached some photos of the results with 37502 running together with 37506. 37506 is also a standard GF Model, this one is straight our of the box without any modifications or extra detailing. The BDAs forming the train are also straight out of the box, stanchion rails or steel load not yet fitted, these details will be added at some point. I just used these to make a quick train for these photos. In the process of track cleaning ready for this winters running. Vic
  18. Update from Chawn Park N gauge model railway. After around 12 months this update is overdue ! I start with a photo of a new addition to the Chawn Park fleet, a class 37 with the running number 37502 and named British Steel Teeside. Livery BR Rail freight red stripe. This is a standard model by Graham Farish. The level of detail "straight out of the box" is very good a massive improvement over my early Graham Farish locos. Weathering is by TMC models. I plan to use this locomotive in conjunction with the rail connected steelworks which forms part of my layout. I doubt if this locomotive in real life ever delivered steel to any of the British Steel Sites in the West Midlands, but since I am not modelling a real location, for my purpose it is acceptable. If you are looking at Chawn Park layout for the first time I have included a photo which shows my model steelworks buildings, these represent a typical West Midlands industrial complex. Vic.
  19. Back to N Gauge modelling, a few quick night time photos, enjoy Vic
  20. 009 Locomotive on N Gauge railway !!!!!! Following my recent visit to Pecorama where I saw the fantastic Bachmann Ffestiniog Railway Double Fairlie locomotives on display, well these are such nice little models, and they fit my N gauge track. Yes it is a different scale but it would be possible to run on my track. Suddenly memories of holiday's in North Wales and the Ffestiniog railway, so I purchased one ! I ordered a 3D printed crew and I have just spent a day giving this lovely little loco a light weathering and a few extra details. Below image shows the loco standing just at the end of Chawn Park station, at this location I can avoid the out of scale station although it looks a little strange standing on standard N Gauge track. Below Photo, this time I placed the loco on the exchange sidings. The fire mans side with very full coal bunkers looks like it is just leaving the shed. Below the drivers side Below photo of a real locomotive, this shows how good the Bachmann model really is Finally photo of the loco before I gave it the light weathering. Straight out the box the finish is fine, but for me it was just too clean so I just toned it down a little. The background of my N gauge layout is totally incorrect for this loco, but at least I have been able to run it and it is totally smooth running even at the slowest speeds. Anyway back to my normal N Scale modelling neat Vic
  21. Class 17 Clayton standing in Chawn Park exchange sidings. This loco just arrived ready for shunting the steelworks in tonight's running session. Below High level view looking down over Chawn Park station Enjoy Vic
  22. In my last post I discussed my 30 year old GF Class 43 HST set and that I would try to find a photo of the same train 30 years ago, well here it is, see below. Quality of photo is quite poor but at least I still have some photos from that period of early construction. The GF HST set contained the two power cars and one coach, these are the ones standing each side of my Chawn Park up platform just after tracklaying in 1990. After constructing the baseboards in 1988, the fiddle yard was laid with Peco code 80 track and points. The fiddle yard is the area in the rear section of this view with the parallel tracks, this area was later hidden by the backscene. The viewing side of the layout was to be laid with the then new Peco code 55 track system, the flexi-track was available towards the end of 1988 but the points followed at intervals over the next few years, hence it was not until around 1990 that most of the track on the viewing side was laid. I will finish this post by giving credit to Peco, the points on this layout have seen at lot of use, 30 plus years of service in this time only one point failed and that was my fault I damaged it when cleaning the track, all other track points and point motors are still the originals and continue to give totally reliable service. Vic
  23. This photo shows one of my oldest Farish models, this class 43 HST set is now over 35 years old. This same HST set has been running around Chawn Park layout for 30 years, I will try and find a photo of this same train when this area was just baseboards without scenery. The layout building was delayed whilst waiting for Peco to issue the then new code 55 points, so the track in the area of this photo was laid around 30 years ago! This HST is one of the old GF Poole models so no working lights etc. Common for models of this period the gears between motor and wheels used to split, this resulted first in a clicking sound being noted during running and later sometimes complete jamming of the transmission. To be fair to GF they did issue replacement gears free of cost in exchange for split gears returned to them. Often when I attended exhibitions where Farish had a stand I would exchange my spilt gears for new ones. Anyway my old models still run very well although they look quite poor when placed next to some of the current production models. I have modified this set by removing the original couplings and closed the gaps between each coach by just using a hand made replacement. I simply used a length of fine wire linking the bogies bent into same shape as a staple which drops in small holes drilled into each bogies. Since these HST sets do not have buffers I found I can run around 9 inch radius curves and still have coaches in very close contact. Finally in this set of photos, below a view of the lower level area where a collection of locomotives gather in the sidings. The old GF HST set can been seen in the background running on the higher level main line. In this view it is just possible to also see the corridor connectors that have been added which ensure no gaps can been seen between each car in this old HST train. Down in Devon at this moment and plan to visit Pecorama today. Vic
  24. Thanks to everyone for your positive comments about Chawn Park N scale model railway. Now the summer ends it is time to start up the model railway hobby again A visit to the International N Shown at the Warwickshire Event Centre on 10th September resulted in the purchase of some new items. It was nice to see the exhibition was quite well supported with a good balance of layouts, trade stands and experts sharing their skills. So back to news about Chawn Park N Scale layout. First photo in this set shows another couple of the excellent Dapol ICA "Silver Bullets" that i have now added to my existing rake. An interesting find was the Arch Laser range of 3D printed vehicles by Osborn's models. Photo 2 shows a Bedford TK road sweeper straight out of the box as supplied. I plan to add a few more details to this model at some stage but for now it is quite acceptable just as supplied. Photo 3 shows a Dennis Refuse Truck in Orange. This new model is shown placed on the road which runs from the steelworks complex in the background of my model and into the industrial estate area located between the high and low level main lines. Adding these extra road vehicles helps to bring the model further to life and helps set the period. Photo 4 shows a Milk Float by Arch Laser, this model carries a UD logo on the front, I assume this is United Dairy. The surface finish on this model is not as smooth as the others I purchased but it still a good model, maybe when I have time the finish can be improved by polishing the surfaces followed by a repainting. Adding crates with milk bottles will be more of a challenge in N Scale. The milk float is placed on the as yet unfinished road which runs below the low level main line running across the front of my layout. The railway overbridge can be seen in the shadows behind the milk float and further in the background one the the pillars of the higher level viaduct. I hope when this area is finally detailed to have an interesting viewpoint from the front of the layout through the arches with a canal on an even lower level to the left of this roadway and look into the steelworks plant at the back of the layout. Photo 5. This photo shows same part of the layout but from a higher viewpoint. The road with the milk float ( photo 4 ) is below the bridge which passes below the tracks from bottom left of this photo and continues under the viaduct. I have avoided posting photos of this area taken at a lower angle since some areas below these bridges are far from finished. More photos to follow soon Enjoy Vic
×
×
  • Create New...