  1. need help wiring electrofrog points, electrics not my strong point .. trying out oo gauge for once and building a small shunting layout , been told its best to use electrofrog points so the plan of the layout are in the pictures , all points are electrofrog can you show me how to wire up to run a train ?do I need insulated rail joiners ?if so were to put them sorry for being a pain cheers bob
  2. well track lay and running well , control panal all working , now down to the scenic of the layout few pictures to show what I did well please with the control panal as this was my first time at attempting one ,.. thanks for looking b
  3. well track and points all done ,made my own control panel lol all working ,try the train on it late this afternoon and it keeps de-railing at one point not sure why ? I will have another go tomorrow then see what happens , very frustrating ..... bob
  4. hi , I had just started to build this layout , its 3ft x 2ft6 split scene , No particular era or area , base is build now doing track and point wireing thanks for the help on here few more point motors to do then I will take pictures of layout and start doing the scenics and buildings ...hope some of you like cheers bob ....
  5. hi thanks very much, thats great my friend ...... cheers bob
  6. hi, only voltage I have is from gaugemaster control 12or 16 v and I want it to power the isolated section as well as the lights from the same switch ? hope you understand .. lol bob
  7. hi can anyone tell me how to wire up 2 led lights red/green to a switch ... it for when off it will light up red and when on it will show green its to show on a isolated section on a panel ,, hope you understand this ... pic would be great cheers bob ps I am cxxp at electric so make it easy ..... cheers bob
  8. hi I understand your drawing , its a lot of wiring but I can do that ,its just how to do a control panal ? with 9 dpdt switches plus 7 switches for point control ? it be bigger then the layout lol , I am only a newbie . cheers bob
  9. hi all, well I started this little layout its 3ftx2ft6in its going to be a spilt scene , I have put the track down but not pin it down yet , the wiring side of it I am not to sure I would like to run two trains maybe 1 just shunting down the bottom while the other can just go around ? if you get what I mean ... pictures of layout .... any help would be grateful please .. cheers bob
  10. sorry too say this project is now abandoned due to heath reason. it was just to big .. I am going to build a smaller layout 3ft x 2ft 6" a two scene layout .. plans are already done and base is nearly there just waiting for a few things and hopefully I get going again .. I like to thank everyone who help me with the other layout.... again I be asking more silly question lol cheers bob
  11. ok thanks everyone for your help ... and thanks chimer for the drawings a great help .... time to get started cheers bob
  12. NO not at all my mistake and thanks
×
×