Finished the baseboards around the loft this evening. Can't believe it has taken two months! Life gets in the way of model railways sometimes!!! Have some track laid and a single line running around 3/4 of the space so far. Mess everywhere now of course! Lots of loose bits of track around the place. The Ouse bridge, out of necessity has to be around a curve after the station and will be a 'not quite prototypical' off-the-shelf Bachmann model. The two signals on the up side of the station will be working Dapol units controlled by an Arduino - I also got the code working this evening, an IR detector under the rails will switch the signals to Danger after a train passes and hold there for 10s.