Jump to content
 

Peak

Members
  • Posts

    22
  • Joined

  • Last visited

Everything posted by Peak

  1. I forgot about that. I have never made a layout before.
  2. I will mark up platforms and buildings on the floor before starting to construct the layout.
  3. How much of the area would be reduced? Would East Yard and Fisherton Yard still be there?
  4. I have decided that in the near future, I would build a Late 60s/Early 70s oo gauge layout of Salisbury Railway Station. How do I find out how much space I need to construct it?
  5. I think the new workshop in South Yard will be more than just a conversation studio.
  6. When layouts are built and they are through stations like Doncaster, they build a loop so the trains can come out the other end. How do they deal with that when modelling terminus stations?
  7. On the Facebook group, Realistic Railway Modelling, somebody is building Paddington as it was in the 1950s.
  8. Can I build the same layout as someone else? Lets say that I was building an OO gauge layout of Paddington and someone else was doing the same, would that be fine?
  9. I don't know where else I could've posted it on. Everytime I try to register on the National Preservation forum, they said I would recieve a confirmation email but I never have. I have tried emailing them asking about the situation but I have had no reply. Could anybody help?
  10. I was thinking it would be where the tent is near station hall.
  11. Could you point out where that would be on google maps please?
  12. Isn't she wrong about North Yard as that isn't owned by the NRM? I presume she means South Yard or North Shed as there is a prep bay in North Shed?
  13. I've just asked Julie Moody who is involved with Vision 2025 and she said this.
  14. It had been moved to the prep bay last time I was there which was on 14/2/24.
  15. I read a few pages that mentioned it but only found two. https://www.national-preservation.com/threads/nrm-workshop.1419879/ https://www-railadvent-co-uk.cdn.ampproject.org/v/s/www.railadvent.co.uk/2021/07/nrm-give-august-move-out-date-for-steam-locomotive-60007-sir-nigel-gresley.html/amp?amp_gsa=1&amp_js_v=a9&usqp=mq331AQIUAKwASCAAgM%3D#amp_tf=From %1%24s&aoh=17082494024725&csi=1&referrer=https%3A%2F%2Fwww.google.com&ampshare=https%3A%2F%2Fwww.railadvent.co.uk%2F2021%2F07%2Fnrm-give-august-move-out-date-for-steam-locomotive-60007-sir-nigel-gresley.html
  16. What about in the new Central Hall?
  17. A few articles from a few years ago have said that after Wonderlab had opened, the NRM would get a new workshop. Will it happen as part of the NRM's masterplan Vision 2025?
  18. I wonder what is happening with it now.
  19. I wonder if there is some website that tells you the progress of all the locos on the NYMR that are under repair.
  20. Does anyone know what is happening with Class 08 08556 on the NYMR and if so can you give any pictures of it in recent months?
×
×
  • Create New...