  1. 2 hours ago, 1E BoY said:

     

    They obviously realised the problem early on. However, they need access between the two main works sites one of which is on the right by this junction which is also the access to a small industrial estate (several occupants being involved in the motor industry). The other is the old Telephone Rentals site which is to the left of where the picture was taken from.

     

    This picture was taken Saturday 16 January.

    20210116_140946.jpg

    Did you get a picture of new entrance they are making?

  2. 1 hour ago, 1E BoY said:

     

    Work continues to get the road ready for reopening (I was told Friday by one of the workers). They were painting the new hoarding on the carriageway to the western part of Bletchley, wiring the lights and zebra crossing, replacing some of the pavements, removing barriers on the eastern approach road and generally tidying up the site.

     

    The reopening of this stretch of road will relieve pressure on Water Eaton Road (total chaos at school times). 

     

    The main work site between the station and the flyover is now behind barriers allowing work to be carried out with the railway still operating. This provides a lack of photographic opportunities in this area.

     

    We have had a letter from Network Rail advising us that work will be carried out between 24 Dec and 27 Dec replacing the overhead wires. Construction of the new sections of the flyover will commence in the new year. 

     

    A section of Water Eaton Road will be closed between the 11th - 15th January to facilitate construction of a new entrance to the worksite between the flyover and the WCML bridge.

     

    The photograph shows the WCML with the east bound carriageway nearest the camera.

     

    The second picture is looking east towards the town centre.

    20201216_121111.jpg

    20201216_121205.jpg


    I heard behind the weldex crane they have a new white crane and piling machine in the site yard where the former telephone rental car park is? 

  3. On 02/12/2020 at 21:45, 1E BoY said:

    They were moving barriers today which look like they will reduce the dual carriageway on the west bound (towards Old / Far Bletchley) to a single lane and to allow the creation of a new protected work site at the end of Duncombe Street. Pictures taken around 1000 this morning.

     

    Even the reduced road space will greatly improve traffic flow under the railway which for the past few months has been reliant on the Water Eaton Road bridge (single carriageway controlled by traffic lights) which has caused severe congestion at school times. 

     

    20201202_100645.jpg

    20201202_101038.jpg


    Any updates to Buckingham Road Roundabout recently? 

  4. 16 hours ago, 1E BoY said:

    There was considerable work going on today at the end of Duncombe Street on  the two piers.

     

    The second picture taken from Water Eaton Road shows the crane referred to above being dismantled this morning.

    20201105_115203.jpg

    20201105_124202.jpg

    The crane has its crane arm extended higher so they must be lifting something heavy as I saw this afternoon but unfortunately I don’t have no pictures. 