Jump to content
 

BelsteadLane

Members
  • Posts

    218
  • Joined

  • Last visited

Posts posted by BelsteadLane

  1. Wratting Road Layout Tour P2

     

    Sorry for the large gap and inconsistent posting. Some more photos now but showing the least interesting places still yet to be made, but I’ll say the future plans for them all. 
     

    FL Depot Facilities

     

    0933523F-584A-448E-B62A-A3BBAFFC6336.jpeg.db142531af92089b2cc7f1ae3da161db.jpeg

     

    This will be the facility area for the Freightliner depot that will be accessed via the headshunt. The area will have an inspection pit, fuelling points, fuel wagon storage siding and a spare loco siding. A few changes need to be done to the track plan, and the buildings and facilities still need to be sourced. 
     

    Mainline Continued

     

    8AE4BCBC-8619-4E77-9D97-7B52EF6A13B8.jpeg.e5264d8fd251eacea981b415e53082f3.jpeg


    The mainline continues with the depot’s reception line running alongside making the number of running lines 3. I want to have a road over rail bridge somewhere along the bend and in the corner of the layout on this side, have an ohle feeder station and relay room. 
     

    EB18B764-8E49-46AC-BF3B-23B683741C39.jpeg.93e792da51d768fb1a52dadad9f59cd3.jpeg

     

    I plan to make another embankment next to the mainline and have a road scene with low relief buildings roughly where the bowls in the above are. This will lead to the bottom photo which is where the other scenic break will be - marked by where the ballasting stops. Another road over rail bridge will be here giving a nice sizeable length for a road. 

    spacer.pngspacer.png33A641CB-F357-4322-9063-9EA08D7542E9.jpeg.ff02eb678bbcd8d50aac592bce6f39f3.jpeg
     

    Fiddle Yard/Non Scenic Section
     

    073772C2-5A2E-467F-9ADB-5F634518EDBA.jpeg.0289324d1ffbdda36fd19f609bcd4d95.jpeg

     

    The fiddle yard isn’t big at all and certainly isn’t interesting to look at. There’s no points for the mainline so trains can run round and round with minimal issues and minimal chances of derailing. All operation interest goes into the depot so it keeps it nice and simple for me to operate. The photo I took the other night of the fiddle yard is the wrong orientation annoyingly so apologies for that. I hope nobody injures their necks!

     

    Hope this gives an idea of my layout size and a bit of an insight to what WR will be. It won’t ever be anything amazing, I’ll always have a ‘my first layout’ approach to it, but I’m using it to build up my skills up and when I come round to build my next layout, it’ll hopefully be something special! 

     

    feel free to ask any questions you may have

    Cheers, Jack. 

     

     

     

    • Like 7
  2. Squirrel Rail 90048 is now in the Wratting Road Fleet. Looks spectacular running under the wires. Currently running in before a change of address and I’ll change the pantograph cv’s as well. 
     

    top work Jerry. And you’ll be happy to know the cab light does in fact work. Might have just been the track I brought round to test it on. 
     

     

    7F6915AC-67E8-4634-A79F-F61FD06AD19E.jpeg

    36D49D5B-C143-4F1D-8A5E-87434A978401.jpeg

    9DFCC762-036D-4BB1-B622-6512E60D05DF.jpeg

    50E43EBD-A607-4DC3-9135-7CE613DF2D78.jpeg

    • Like 13
  3. 11 minutes ago, pitbull1845 said:

    Welcome to RMweb, 

    I've been subscribed to your YT channel for a while now, really like what you've done with the space available. 

    The layout looks great.

     

    Cheers 
    Scott

     

     


    Cheers Scott! 

  4. Wratting Road Layout Tour:

     

    Heres some pictures showing a bit more of the layout and as you can see, it really is very much a WIP with lots of baseboard yet to cover! I’ll give a quick but detailed explanation describing the pictures. 
     

    Tunnel Scenic Break 


    BE47CAA2-5477-4415-814B-E2F85EE31C58.jpeg.9ddc474e1d153f9621087aeaade71ca8.jpeg

     

     

    The same photo as in the first comment on the thread. This is one of the scenic breaks and entrances to the non-scenic fiddle yard (and i use that term very lightly)  it’s a simple two track mainline. This area is inspired by the south/countryside end of Ipswich Tunnel. One day I would like to scratchbuild a more accurate looking tunnel porter for my next layout but for now the Peco tunnel mouth with weathered brick sheets does the trick. The white backboards will have a backscene on eventually - something I will do soon (and probably should have done much earlier on in the layout build!)

     

    Looking in the other direction from behind the scenic break backboards:

     

    DFADB215-DE70-4B68-9B2C-F208DB97BB0F.jpeg.d725847f13d46118fe86a66cd3c1d94a.jpeg

     

    This is one of my favourite places to stand and watch trains run by. From this view, you get a better view of the disused signal box on the right hand side, and of the sidings for the FL train crew depot. With the signal box, you’re probably thinking why I’ve put one there - I’ll get to that later. 
     

    FL Depot Sidings 

     


    121FC78C-3DCD-4EA5-8E53-64603B4992AD.jpeg.3a16ed5b8094ee9c2fccf94946238112.jpeg

     

    Here’s the stabling sidings for the Freightliner depot. These are made up of 4 sidings which are the 4 tracks in the centre and on the left. The track furthest to the right is the headshunt, what locos use to reverse and access the depots facilities - this area is yet to be built hence the pause in ballasting. This still needs some driver or staff figures, depot lighting and buffer stops to be added until I’m happy with the area. 

    You can just about make out the relief siding on the left by the white buffer stop, which is outside of the depot boundary. The relief siding is/will be electrified so this is where the FL electrics  will be stabled to await further duties or to be shunted/propelled into the depot by a diesel. 
     

    Mainline


    CEEB8A8D-1A5A-4BA8-A793-F303BF47BECA.jpeg.2e2b0601bb396de1e8b3cef52c1fe26e.jpeg

     

    The relief siding I mentioned above is the line on the left (the overgrown one) and the two other tracks are the main running lines. You can see the two sets of points to access the FL depot - The idea of having two access lines came from the FL depot at Ipswich which does the same thing. All that unballasted track off centre too the left is the Depot’s facility area.
     

    This is as far as scenery has come so far on the layout. I’ll post the more boring bits next on a different comment at some point!

     

     

    • Like 18
  5. 27 minutes ago, brushman47544 said:

     

    Superb all round, but could the Class 90s push during the period they were converted to 90/1s? I only remember seeing them hauling until they were converted back to 90/0s


    I’m not sure on that one, sorry. 
     

    90/1s were dedicated freight locos iirc  so quite possibly you are correct. 
     

    my 90128 is currently away being renumbered to 028 and being weathered and detailed up into its ‘privitisation’ condition. Those Virgin mk3s aren’t in that livery anymore either! It’s a pretty old photo but the only good one of 128 I had

    • Like 1
  6. 7 hours ago, 'CHARD said:

     

    I would normally cut the pictures from my reply, but I'm deliberately not on this occasion, as I want to emphasise how good your layout looks - can we please see more of Wratting Road!  Only 2 posts - layout thread would be grand!!!!!

     


    Thanks for the kind words. 
     

    I’ve just started a thread in ‘layout topics.’ 

    • Like 3
    • Round of applause 1
    • Friendly/supportive 1
×
×
  • Create New...