Been working on a new layout now for 2 weeks, I have all the base wood in Track laid down and have been working on glue the cork and track in place, running the electrical wires. My father is coming out from the UK at the end of the months so I want the lower level of the layout track work 100% complete, other than ballast, and hopefull the second layer, which is just a point to point going though a hidden section, of an over head commuter line.
- Read more...
- 0 comments
- 256 views