Hi
Wondering if some one could give me some advise please.
I'm looking at using Peco code 75 points with SMP track for my current layout, but I've noticed a slight height difference, Peco point track is slightly higher.
I've been able to make up the difference by using a thin piece of plasticard tucked under the SMP track at the intersection.
Would this be good practise? or are the two not compatible?
Thanks