Hello
I'm sure that there will not be too much rivalry on this layout. Our layout is set in 1977/78 so falls firmly into the 'what if' category of layout. We will be modelling the signal box but the signalling will be very much rationalized due to the closure of two of the tracks which led into and out of the station. like the track plan will be simplified as so much was in the 70s in an effort to keep the costs down. I'm sorry Chris but i have no idea what the layout of the box was in the earlier,( and real), era so we shall just have to mjake ours up though I suspect there will be a fair few white levers. We could have got rid of the box as well I suppose but it looks to good and unusual in design not to feature it. I think the plan is that I build the box and John will do the station building which will be in low relief to save space. Another new development is that the layout will be DCC which will be a first for us both and the signals will probably be from the nice Mr Dapol having seen them on a friends layout recently at Alsager and being impressed by them. Something less to build as well. No problem with your hijack, this is what modelling is all about, just sorry I couldn't be of more help. Best of luck to your father in law's layout. Just one more thing to add is that we have nearly finished the baseboards and hope to start track-laying over festive holiday period. Also thanks to the folks who sent us the photos; much appreciated.
Cheers
George . .