Jump to content
 

Keeping 26043 Alive.......staying a HEAD of the curve


A bit of a boring one really, as it concentrates more on a single part of the engine but ill try and bed it out a bit more with some more slightly interesting bits..... :)

 

20201031_150520.jpg.30da1e91bf0a105a8872b7bc65cc0529.jpg

 

A view of 26043s 6LDA with both side covers removed (reason why will be explained in a bit)

 

In this view you can see where the block is bolted to the crankcase, and you have a good view of the camshaft, there are 3 cam lobes per cylinder, the outer 2 of the lobes operate the pushrods and the centre lobe operates the fuel pump, also note that the camshaft is gear driven (a common sulzer trait), as opposed to the chain driven English electric engines. This eliminates chain stretch and failure as an issue for timing (which is a common issue on English electric engines) the cam Is driven by a pair of reduction gears from the main camshaft, each individual component is bolted to a central shaft. Above the lobes you can see the cam followers which are effectively 3 individual "pistons" which rise and fall on the lobe to operate the equipment they connect to, a push rod or a fuel pump.

 

20201031_150529.jpg.7db0918f5f3baa7bdd80808e99fe62e6.jpg

 

Another view, the shelf above is the fuel gallery, which contains the fuel pumps and push rod tubes (all removed for overhaul) just below that you can see the fuel rack, which is a mechanical linkage which connects the engine governor to the fuel pumps so the governor can control (according to the drivers demand) the speed of the engine. over to the left (out of view) is the overspeed trip which is a mechanical device which is connected to the cam shaft, in the event of on overspeed the cam shaft will lift a spring which will snap the fuel rack closed and shut the engine down. The black pipe running along the cam shaft is the oil supply rail to the cam shaft bearings and lobes. At the bottom you can see the engines main oil filter.

 

20201031_150624.jpg.61f2581f18206b7d414778dc4b3d8f8e.jpg

 

One of the engine side covers being steam cleaned, 3 layers of paint were steamed off this ready for repainting, you can see the 6 Kyocera valves, which have had there covers removed, The job of the valve is to vent dangerous amounts of crankcase pressure which is not being vented through the crankcase breather (which has a labyrinth) and also to limit damage as the result of a crankcase explosion. these valves are unique to sulzers, and were retrofitted to all sulzer engines at some point in the 1960s, prior to this they had just a solid door. This came about after a peaks crankcase exploded do to a build up of iron filings at one end of the engine (generator end) the subsequent friction cause a spark and ignition of the crankcase gases, the engine was destroyed in this event and it was envisaged it could have been saved if it had valves fitted to vent the gases in a safe way.

 

IMG-20201024-WA0007.jpg.3448879fbdffe60d5281f4173dbf4cab.jpg

 

as seen in the previous blog, there was damage around the liner seal lands....with this damage present on the liners it was suspected that this would be present on the opposite surface of the engine block, and after climbing inside the engine to get a good look, its confirmed that severe damage is present. This damage would see the block written off by BR, and a new engine fitted (if authorised) obviously we dont have that luxury so we need to find a way around it. In the damage above you can just about make out the position of the 3 liner seals, and then the machined surface below it. What has happened is coolant has found a way past seals 1 and 2 and started to go to work on seal 3. This has occurred because BR did not use antifreeze, antifreeze (apart from not freezing) has the advantage of a corrosion inhibitor. However......BR kept corrosion at bay by using a chemical called borax, which was added to the water in the engine to stop corrosion. The other way BR stopped corrosion was by never ever draining there locomotives. The depot rule was, when temperatures were 2 degrees the locomotives were to be started and kept running for 2 hours.....every 4 hours....if the temperature was below zero....the locomotives were kept running! failure to do this meant blocks and turbo chargers would split and cause severe damage to the engine. In preservation though, that's not an option.....cost being the main cause and also idling engine without then putting them under subsequent load causes bore glazing, which then means the locomotive starts throwing oil out the roof. So in the winter locomotives are drained....and when you drain a locomotive, you allow oxygen in......and this is what happens!

 

IMG-20201024-WA0005.jpg.73e708da8bfe8df7ae0a83e222401fc3.jpg

 

Another damaged bore.

 

IMG-20201024-WA0006.jpg.bdc4436ea2fba95f61f87e3ccf52e337.jpg

 

to resolve the issue, we are using Belzona 1511 which is a very expensive very high immersion temperature chemical metal, which has been applied to all the bores affected and will shortly be sanded back to bare metal which means the pits you see in pictures 1 and 2 will be filled and a water tight surface created.

 

20201108_144257.jpg.c092ca156bfb42265d743ab9fa41fa72.jpg

 

Other areas of work are the overhauls of the heads, each head has been completely stripped down to the bare casing, for repainting, relapping of the valves, and replacement of the valve guides, which were all found to be worn beyond the acceptable maximum. Here we see one of the heads on a hydraulic press having the guides removed, each guide requires 2 tons of pressure to free it from he head.

 

20201108_152304.jpg.2a6a303d05ab22de97b5e658f5ee5fe7.jpg

 

A valve port after the guide has been removed.

 

20201108_152317.jpg.1e0f9cd5f8132ff6710c398251a03a9c.jpg

 

An original valve guide

 

20201108_152839.jpg.1dc954d80fbc710a12759f62c8108071.jpg

 

A valve guide port prior to cleaning

 

20201108_153620.jpg.57fb735a55a56b5f46fe2bba0168f8a9.jpg

 

A guide port after cleaning

 

 

20201108_153610.jpg.bc42f8f37e23d3c95cc1e5804fba8bab.jpg

 

A brand new valve guide being inserted....the new guides are pushed home by a rubber mallet and a smear of loctite to hold them in place. the heads have all been very roughly primed to keep surface rust at bay, once the mechanical work is complete they will get a full repaint.

 

20201108_142700.jpg.e87907f17d3fe93d5a391aa7143d96c3.jpg

 

After the guide is installed kerosene is poured around it, to confirm that the guide is fully pushed home and fully sealed.

 

IMG-20201108-WA0005.jpg.6b49492a4755bf3e41c18bcc8ab52db8.jpg

 

with the new guides installed the valves can be lapped with grinding paste, a corse grind is completed first using a sacrificial valve, and finally a fine grind is completed using the valve that will be installed in the head.

 

IMG-20201108-WA0006.jpg.58c3256e685c1cc66e1bd7c3e9ff71da.jpg

 

as can be seen, it doesn't get all the marks out, its just a case of making it as good as possible.

 

Thanks for reading

 

 

  • Like 5
  • Informative/Useful 8
  • Craftsmanship/clever 1

6 Comments


Recommended Comments

  • RMweb Gold
Phil Bullock

Posted

Simon these are fascinating blogs! Please keep them coming....

  • Like 1
  • Agree 7
Crisis Rail

Posted

Proper -  Proper Engineering.

  • RMweb Premium
readingtype

Posted

Ignorant question, apologies, but has anyone in preservation contemplated re-engining a loco such as a class 26 with something else? Did the Sulzer model used in the type 2s develop further after the 1950s?

  • RMweb Gold
pheaton

Posted (edited)

12 minutes ago, readingtype said:

Ignorant question, apologies, but has anyone in preservation contemplated re-engining a loco such as a class 26 with something else? Did the Sulzer model used in the type 2s develop further after the 1950s?

The sulzer 6lda and 12lda was built under license by electroputere in Romania until 1993, there are  quite a few sulzer 6ldas and 12ldas running around on the continent.

 

Sulzer engines didn't seem to follow the pedigree of say English Electric engines...so for example the class 20 8 CSVT can be traced all the way to the Ruston 16rk3ct fitted to a class 56....its an evolutionary development.

 

The 6lda series wasn't really developed beyond what you see made by Electroputere, and other than the fuel pumps and governor there isn't a lot of difference, and this primarily because the sulzer engines were marine engine based, and it worked well for the application, so to my knowledge wasn't developed further in that form. The English Electric engine however had a lot of work in standby generator applications,  so evolved to be gas powered for example. But also in the case of the class 56 had its heads modified to cope with the higher power outputs, advances in pistons were also made as well.

 

Re-engining no, TBH the heart of a type to is the sulzer engine...without it, it would be soulless. It would also be a major challenge mating the CP generator to such an engine, and maintaining the control of that generator....some which ill touch on in the next blog.

 

 

 

 

 

 

Edited by pheaton
  • Thanks 1
  • Informative/Useful 1
cheesysmith

Posted

Pity we dont have the R engine, which was to be the final evolution of the LDA series. The crisis with the twin bank engines over took it, and it ended up forgotten.

 

If what i have read, the R series was a short stroke 4 valve head version of the LDA, so it would have been backwards compatible. 

  • RMweb Premium
New Haven Neil

Posted

Nice to see this work being undertaken - we used engines like this in the merch for generators.  You refer to crankcase explosions, it is of course the secondary explosion that is the big one, after the first one errr blows the doors off, if you don't have the relief valves. 

 

I hate seeing old engines at shows on the interweb with plexiglass crankcase covers so the punters can see the whirly bits, if they ever do have an explosion it'll be a big one.  the large marine engines (90cm bore) I worked on have explosion relief doors a couple of feet in diameter, as well as 'oily mist detectors' to try to prevent a crankcase explosion in the first instance.

 

Nice work, keep it up!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...