Cheddar P4 - November 2022 update
Starting to find the time I need to make progress when I can. Since the last entry I've completed the first batch of platforms, fencing and made a start on the greenery on the up side of the station. Barrow crossings have been added too. Platform faces and barrow crossings are scribed Palight. which is a foamed pic sheet. Surfaces are generally stone dust from Atwood Aggregates, applied onto glue/paint and suitably sanded down afterwards. Fences and gates are the usual Ratio products. I'm working on the stone loading point which was added by Chelmscombe Quarry in the 1950's at the moment. In reality the siding stretched around the front of the layout but I don't have enough width to represent it, so a small cameo of one of their lorries tipping into a wagon is planned here.
- 9
- 8
6 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now