UK outline train ferry terminal project in n gauge loosely based on modern southern region prototypes borrowing heavily from Dover Western Docks, Admiralty Pier, Folkstone Harbour, and a little bit of Harwich. Imagine if the channel tunnel hadn't caused the train ferry to close and instead the two complimented each other and built international traffic upto the present day. 'Seahaven' is my realisation of that idea. 

IMG_20200826_212559_1.jpg

Entries in this blog

Paving the way...

Did a bit of work around the station this evening. Produced some brick walls to the rear of the viaduct to represent the rear of the structure. I also used some modern platform paper to complete the finish of the platform surfacing.    (paving paper done from scale model scenery. Like the look of the tactile paving)    (brickwork parapets 'laid' along the backscene)    I also have had time to do a bit of bodge wiring. Whilst my father is a retired electr

Paul Robertson

Paul Robertson in Blog

Paving the way...

Another new experience today using DAS clay. Never used it before so took a few tips from some entries on the forums here as well as some YouTube instructional videos before setting off.    I've seen lots of US railroading videos using woodlands scenic liquid plaster material to create roads in n gauge. Looked a bit messy and fiddly to me having to mix up the right amount mask off areas and make sure everything was dead level to prevent leakages. The effect of the plaster was effective

Paul Robertson

Paul Robertson in Blog

Painting the billboards...

You might have seen sometime back that I had created a sign sheet with some billboards. To test the theory and the new range of acrylic paints that I had just got I thought I would knock up some billboards and give it a go at painting them.      This was the sort of look I was going for which seem pretty standard with a timber close boarded base. So once again it was out with the balsa wood and marking and cutting    (a base blank marked out with the dims of

Paul Robertson

Paul Robertson

Painting some buildings...

Having completed the ship painting and decals I concentrated my efforts on the first set of buildings I had constructed. The station would need several coats of white paint to cover the balsa and in between that I painted the portakabin and security kiosks.    (first layers of white going on with the other buildings getting their first coats)    (the portakabin and kiosks painted up)    Five coats of white paint later and I was ready to paint the roof of

Paul Robertson

Paul Robertson in Blog

My first scratchbuilt building...

As well as more work on the civil engineering today I also made my first scratchbuilt building. A security kiosk. I need to make about 5-6 of these so this was just a trial run   With a bit of painting and so correct signage I think it should do the job. Greater scratchbuilding challenges lie ahead.    (first attempt at a light mast base. Unfortunately couldn't cope with my drilling a hole in it)    (attempt no2. Working better. This 5mm diameter 3

Paul Robertson

Paul Robertson

More signs, barriers, and some point levers

More detailing around the lower yard today having painted the track work yesterday.    (das clay and ballast on the lower yard)    (trackwork painted)    The first detail around the yard were more crash barriers to prevent vehicles driving onto the tracks   (barrier by the parking bay)    The next detail was point levers. I made these by bending some 1mm brass tube with plyers and sticking them in some 3mm thick balsa.   

Paul Robertson

Paul Robertson in Blog

Mixing the civil engineering...

So today was a lot of bits being done round the layout to complete minor bits and bobs whilst waiting for the pva glue water to dry out. The video I watched said the layer of pva would take about 1 hr to dry. Try about 24hrs! So I had plenty of time to do other things   First job was marking out the precast concrete units for the bridge abutments. Having completed this all the lines were weathered to tone them down a bit   (all lining complete)    (some

Paul Robertson

Paul Robertson in Blog

Mind the gaps...

There were lots of large gaps in the ferry woodwork which needed filling. The chimney stacks consist of 3 pieces of 5mm ply stuck together which had been cut out with a jigsaw so not desperately accurate. Whilst balsa helped to cover over the crude edges there were a lot of visible gaps between balsa and ply. With not much time for modelling today (I had a big odd job 'to do' list) I decided that might be a good small job to fit in around chores. I had bought some balsa filler which seemed to of

Paul Robertson

Paul Robertson

Making waves...

It's been a little while since I last posted. I've been concentrating on getting the sea finished. Eventually after 48hrs the PVA dried. Now for the fun part of tacky glue and making some wavy texture.    (Dock ready for texturing)    Put an angle on it to make it look like the breeze is blowing across the Dock. The glue holds its shape pretty well and with the aid of a cocktail stick I could get rid of the bubbly bits and make it more wavy. I did two treatments of this

Paul Robertson

Paul Robertson in Blog

Linkspans and kiosks

Following on from yesterday's scratch building attempt of a security kiosk I had a look at it again this morning and decided I could do a bit better   (yesterday's effort was a bit crooked and lacking in detail)    I thought the scale looked a bit too big as well and a quick Google found the the height was a bit on the generous side for this type of building. Out with the craft knife and some more styrene angle to highlight window ledges and to make a door and I soon ha

Paul Robertson

Paul Robertson

Linkspan structurally complete!

So a busy day of modelling today with the aim of getting the Linkspan winding house structurally complete.    Firstly I assembled the leg structure cutting the tops and bottoms of theain structural supports to get them sitting at an angle as per prototype.    (leg structure coming on ready to be attached to main support structure made yesterday.)    Having created the legs a quick check was made to ensure the legs lined up with the 'concrete' pile caps. 

Paul Robertson

Paul Robertson

Lining out...

This weekend was a chance to finish off painting the asphalt and to make a start on getting all the road lining and decals down. Ferry terminals seem to be covered with white yellow and red lining of different sorts so out with the acrylic pens and bendy ruler to start marking it all on.    (marking on the top road lines first using the bendy ruler for the corners.)   (I then marked out a chevron where the two routes split before marking the lines down the ramp.)

Paul Robertson

Paul Robertson in Blog

It's been a while...

The past couple of weeks have been taken up with all things other than railways. The family invented an xmas card game which I needed to produce on the computer, and the emergency volunteer group I run has been involved in covid response recently. It hasn't been all quiet on the modelling front however. I completed the lighting on the ferry which now includes navigation and flood lighting.    (lighting now on board)    The train deck has three white leds to give that we

Paul Robertson

Paul Robertson in Blog

If it doesn't move, paint it...

So this week has been spent carrying on with the train ferry getting copious layers of paint on to try and get a decent finish. Having already applied the blue (4 coats) I then started with the white. This took 5 coats of paint to fully cover the ply, balsa, and blue paint over spill. The moment of truth came when removing the masking tape. Had all that resin prep been worth while and were there any bleeds of paint under the tape?      Pleased to report it all went pretty we

Paul Robertson

Paul Robertson in Blog

I see the sea...

A family game that was played on the holiday car journey was who could spot the sea first from a glimpse down a valley. Whether heading to the ferry or just a coastal trip the first sight of the azure greeny blue sea on the horizon would illicit a chorus of "I see the sea, I see the sea." from the back seat of the car! And so it was my turn to try and create the alluring sea which I used to sea on my family holiday.    I had watched a video by Kathy Millett on an easy way to create wat

Paul Robertson

Paul Robertson in Blog

Getting to grips with some fiddly balsa

So this evening I have been working on the marine architecture and civil engineering with more detailing on the ferry, bridge, abutment and retaining wall. Plenty of balsa wood used to try and replicate the mooring details on the ferry which seemed to have quite complicated bollards on the nord pas de calais prototype. I assume this has something to do with the moorings linked to the computer controlled Linkspan. Anyway done my best to represent it and will make good with a bit of filler! The up

Paul Robertson

Paul Robertson

Gaining control...

Having constructed kiosks for traffic marshals there was a further one required for the upper linkspan where the control gear should be kept to operate the structure. These are usually small kiosks perched on the end of the Linkspan to give maximum visibility for the operator. Having looked at a few examples I didn't think my standard design used so far would be suitable. The kiosks I I could see on prototypes were more like rounded grp kiosks like those produced by glasdon without a roof overha

Paul Robertson

Paul Robertson

Found it!

Researching the structures I'm wanting to build is always an enjoyable part of the hobby for me. Unfortunately if you are trying to build something that has been demolished you are left to scouring the internet for photos, the odd scaled drawing, and perhaps a book on the subject if you are lucky. One online article that has proved a mine of visual information and reference in planning for this project has been http://www.doverferryphotosforums.co.uk/ and an article on the Admiralty Pier Train F

Paul Robertson

Paul Robertson

Finishing the permanent way...

This weekend saw a milestone reached on my layout as I finished off the last of the permanent way with more das clay and a final ballasting of the station branch line. It certainly feels like an achievement covering the last of the plywood after 5 months of solid work. The first area to be done was the station layover siding. This will be for boat train stock and the odd civil engineers train. I therefore wanted the siding to have a similar well worn feel to the lower yard and used the same das

Paul Robertson

Paul Robertson in Blog

Fiddling with fiddly balsa...

Having got the basic shell of a station building I wanted to give a bit of detail and shadow relief to the structure.    (starting with the picture windows. In order to get the thin balsa strips to bend enough I had to cut against the grain to allow the grain to bend for me)    Having got the window sills and frames I then turned my attention to the first floor roof which needed a bit of filling. I wanted a lift shaft at the end of the station to give a bit of height. T

Paul Robertson

Paul Robertson

Electronics for dummies...

With my initial success of my high lighting mast under my belt I set forth today to install a lot more lighting. I wanted the lighting under the bridge to represent sodium lighting which is typical of the prototype so installed a couple of LEDs in there and did my best to cover up the wiring from view.    (yellow lights installed in under bridge)    So far so good. Next was the Linkspan proper. I wanted white light on this as looking at prototype night shots from Dover

Paul Robertson

Paul Robertson in Blog

Details, details...

So today I carried on the road cone production line as well as putting more signage about the place and making a couple of extra stop barriers for the lower Linkspan.    (cone and barrier production line)    I also added some more bases to some of the cones to make it look like they have been stacked up on each other.    The next detail was pre-bought. Some grit bins from scale model scenery.    (a pack of salt / grit bins. I didn't feel able t

Paul Robertson

Paul Robertson in Blog

Cones, parapets, and more signs...

Having done the detail up against the cliff base I thought I could build the parapet fence on top of the retaining wall. I was wanting to create something like the below:   (standard boxy parapet fencing)    I couldn't find anything off the shelf so it was back to scratchbuilding with plasticard strips.    I painted the strips up in the colour I wanted before predrilling holes for stanchions. These were glued in place before the long horizontal strips were stu

Paul Robertson

Paul Robertson in Blog

Coming together...

Some times modelling can feel like a very slow process with very little to show for large amounts of time spent fiddling around. Then one day suddenly everything seems to come together to start looking as one might have hoped.    The past few days have been a slow process of trying to get the road surface looking right and introducing road markings. Lots of wrong turns smudges and lessons learnt. Today has seen a bit more progress in the right direction.    First job of the d

Paul Robertson

Paul Robertson in Blog

Chevrons and waterfilled barriers...

A bit of detail at the base of the cliffs today with crushed chalk added and some more signage and traffic management.    I wanted to make some water filled traffic barriers like this.    (this is the sort of thing I was after)    I started with some trusty balsa cutting into three strips and sticking it together.    (balsa strips stuck together)    Having stuck the strips together I chopped them into scale 1m sections before painting

Paul Robertson

Paul Robertson in Blog

×
×