Bristol Barrow Road - Storage Sidings and other updates
It's been a while since I updated my blog but we haven't been idle. Chris has made two Power Boxes one for the scenic side and a Booster box for the Storage sidings. Each contain a Maplins X21M Power unit, PSX circuit breakers, a DCC Concepts 12v Power supply PSU2 and NCE Units - a 5amp command unit in the main box and a Booster in the other. They do look rather smart.
Engine Shed Sidings now has a panel for the turnouts which controls the Fishponds banker siding and the south exit from the engine shed
Chris has done a brilliant job with both Power boxes and the panels and is currently building the Lawrence Hill Junction Panel. When complete and fitted the scenic side of the layout will be fully operational. Both Panels are designed as an interim measure whilst a decision on the design of signalling the layout is made.
The track in the storage sidings is now complete with the addition of 16 Peco EM buffer stops on the dead end sidings.
Here are a few photos of the completed sidings. My next task is the complete the wiring on the storage boards.
- 22
6 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now