Jump to content
 
  • entries
    73
  • comments
    58
  • views
    16,915

Brewery gets a boost


Charlie_k

208 views

30D1A3DF-F464-4DE1-8DD7-726BBD28663C.jpeg.77ccf3d99f22db2a68a1a11434229ab8.jpeg

The corner cover pieces worked, far faster and less problematic than I’d managed before. The doors are fitted, just the near end to do now and the new roof was fitted but still to tile. The base for the water tower was textured. I’m going to try and make a sign for the wall above the gantry, and the gantry still needs pipework. I’ve moved the crane from the front of the layout to the area. There’s a join down the centre of the end wall, better think of doing something there, and the loading platform either needs major shortening or a quick rebuild. Apart from bargeboards, downpipes and the canopy that’s finished then!

 

Thanks for looking.

  • Like 2
  • Craftsmanship/clever 1

2 Comments


Recommended Comments

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...