Brewery gets a boost
The corner cover pieces worked, far faster and less problematic than I’d managed before. The doors are fitted, just the near end to do now and the new roof was fitted but still to tile. The base for the water tower was textured. I’m going to try and make a sign for the wall above the gantry, and the gantry still needs pipework. I’ve moved the crane from the front of the layout to the area. There’s a join down the centre of the end wall, better think of doing something there, and the loading platform either needs major shortening or a quick rebuild. Apart from bargeboards, downpipes and the canopy that’s finished then!
Thanks for looking.
- 2
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now