Jump to content
 

MarcD

Members
  • Posts

    2,747
  • Joined

Posts posted by MarcD

  1. I've been waiting for an order since October. I have contacted them twice now and got the same answer on both occasions. Very sorry the delay it was caused by illness and we are trying to clear the backlog.

    Marc

  2. ECC, formed in 1919, has two different liveries for there wagons a grey for clay and a dark red oxide for coal. Clay wagons were not pooled but the coal ones were. Also there was a merger with another large firm in the early 30's. So this shot must date from about 1920 to 1931. My money would be on earlier than later looking at the weathering.

    The random shapes and sizes of the wagons is due to their origins. In 1919 Martin Bros, West of England china clay and North Cornwall China Clay merged. In addition to this between 1920 and 1929 ECC bought out another 12 smaller companies most of which would have had their own wagons.

    In 1931 there was another big merger to form English Clays Lovering Pochin. These wagons had ECLP on them.

    Marc

    • Informative/Useful 5
  3. The name for those who are not ofay with the work of Dylan Thomas is the name of the town in his play for voices "Under Milk Wood" and the joke can be found by reading it backwards.

     

    The story so far.

    About 2 years ago I started building a 0-16.5 shunting puzzle layout based on Wharf station at Tywyn on the Talyllyn. 

    I build all the wagons form my own kits. So far so good I hear people say. Base board built, the track went down, wagon turntables printed. All was going well until I turned to locos. This was when things started to unravel very quickly. I bought a peco Talyllyn and a Branch line chassis to go with it. I started to build it against a drawing as well as the instructions only to find that the loco was 16mm longer than it should have been and it had a footplate where there shouldn't have been. At that point the project was put on ice and stacked at the back of the workshop. 

    Scroll forward 18 month and Bachmann announced they are going to produce NG7 quarry locos and they should be available by the end of this summer. So the project is back on.

    IMG_20221008_142049197.jpg.9c6a535949ceba089d350a8f62ba7345.jpgIMG_20221009_170119996.jpg.3fc41efa91a3299ece6fa0756a1fa2b3.jpg

    • Like 3
  4. Yes, tried it with no couplings, 3 link and my own Flippems couplings. The automatic couplings are clear and not binding. The bigger the loco the bigger the problem. 

    And according to the BR track manual and scaling them down the should be 56mm long and Infront of the frog. I get away with it as I have my ballast so high it acts as a check rail.

    • Interesting/Thought-provoking 1
  5. I made a similar change to the points I used on W C Boggs I'm still using dead buffered stock shorter than 15ft6 LOH. The problem isn't the frog or the reverse curve it's the size of the check rails and where they have been positioned with respect to the frog. They should be about 3x longer and be in advance of the frog so they guide the wheels round the curve.

    Marc

    • Like 1
    • Informative/Useful 3
  6. If you want to buy RTR track the streamline point's are ok. If you want to build your own then Greenwood pint kit are not bad. Rule of thumb for  0 gauge standard locos and stock 6ft radius points minimum radius. You can go down to 4ft but you're looking at industrial layout and short 4 wheel stock.

    Marc

    • Informative/Useful 1
  7. Only advice I would give is don't use peco o gauge set track. They are far to tight for anything other than small dead buffered stock and the check rails are in the wrong place and about a 1/3rd of the length they should be. I used them on my current micro and I'm wishing I hadn't.

    Marc

    • Agree 1
    • Informative/Useful 3
  8. My wagon range now contains 7 NBR wagons with another 2 in the design stage. They are available as kits in 4mm and 7mm and bodies in HO, S, G1, G2 and G3.

    Available wagons

    1) 1plk 

    2) 3plk fixed side

    3) 3plk drop-side

    4) 3plk centre door

    5) 4plk Drop-side

    6) 4plk fixed side

    7) 4plk centre door

     

    Under development

    Cattle van

    8t box van

     

    Marc

    Pre-Grouping Railways 

    • Like 1
×
×
  • Create New...