Apologies for the lack of activity on this thread, work has been continuing on the layout I just haven't updated RMWeb so here goes.
Station
Filler was applied to the platforms to create a level surface for the platform edging from Scalemodelscenery which is a great product although you have to be very careful with the tactile paving as the bobbles are very delicate even after painting.
More filler was then applied to level the platforms with the edging and this was then sanded and painted.
Still a lot to tidy up but overall I am happy with how it looks. Need to figure out what I am going to do with the area in front of the station, the ground level needs to be brought up so its level with the platform for a start though.
New Tunnel/Fiddle yard entry
For the fiddle yard entry at the station end of the layout I have created a hill and tunnel and plan to site a church on the hill. The hill was constructed from wood and foamboard cover with plaster cloth and then sculptamould, this was a new product for me and I really like it and have ordered some more. The Tunnel mouth was made using Das clay on a wood former.
A strength test was also conducted on the viaduct by my cat Lexie