JackBlack Posted September 12, 2010 Share Posted September 12, 2010 Same here.... Link to post Share on other sites More sharing options...
gwrman Posted September 12, 2010 Author Share Posted September 12, 2010 Maybe something to do with new server, I've not removed them. I can't see them either. However there may be major changes soon thinking of going O gauge. Nigel Link to post Share on other sites More sharing options...
signalmaintainer Posted September 12, 2010 Share Posted September 12, 2010 Is this just me........ all the photos now have a wee box with a red cross in it Stuart. That's all I see too. Might we have the same optometrist? Link to post Share on other sites More sharing options...
gwrman Posted October 19, 2010 Author Share Posted October 19, 2010 Hi, Tolgarrick Road is deceased in 'OO' gauge now all thats left is 2 bare base boards now we're going to extend it by 8' making it 16' so it will be 12' scenic 4' fiddle yard board, small shunting layout in 'O' gauge in the planning to be built at my railway club. NigelB) Link to post Share on other sites More sharing options...
gwrman Posted February 24, 2011 Author Share Posted February 24, 2011 Hi, Tolgarrick Road is deceased in 'OO' gauge now all thats left is 2 bare base boards now we're going to extend it by 8' making it 16' so it will be 12' scenic 4' fiddle yard board, small shunting layout in 'O' gauge in the planning to be built at my railway club. Hi, just thought I'd update you on progress, we've extended the layout by the 8' feet planned and started looking at various plans. Here comes the big 'but', but we can't it all into 16' we need a 6' fiddle yard board making it 22' in total, Oh well. Nigel Link to post Share on other sites More sharing options...
gwrman Posted June 24, 2011 Author Share Posted June 24, 2011 After studying various plan books and consulting with the other O gauge members at the club we decided on this slightly modified version of a plan we found we could fit in to 16' x 2' plus 6' for fiddle yard. If you take the vertical as 2' apart approx. (it was a OO plan) We've decided to use Cobalt point motors and wire for DC or DCC with section switches. I'll be glad to hear your comments, when I get some photos taken I'll upload some. Nigel B) Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.