Reddibus Posted January 8, 2021 Share Posted January 8, 2021 (edited) Welcome to Norgrove the new exhibition layout Redditch Model Railway Club members are now constructing. This new project builds on the experience we have gained from constructing our other exhibition layouts. Norgrove is set in the same mid 1970’s era that our Smallwood layout is. This new 4mm scale layout is based in south Birmingham where the real station of Northfield is. It will feature an island platform, a parcel depot and oil terminal. All this will be in an urban setting with many planned buildings for our club members to scratch build. This concept is very similar to our existing Oakenshaw and Dagnell End exhibition layouts though they are both set in the 1960s steam/diesel era. Covid has slowed progress down but we are currently at the baseboard construction stage and we will bring you progress over the next few years whilst we construct this exhibition layout, Attached is a track plan for the layout Norgrove Plan.pdf Edited January 6, 2023 by Reddibus pic update 7 Link to post Share on other sites More sharing options...
RMweb Premium stivesnick Posted January 8, 2021 RMweb Premium Share Posted January 8, 2021 Hi Looks a great plan and I like the urban setting. Look forward to seeing progress. What rolling stock is planned? Nick Link to post Share on other sites More sharing options...
Reddibus Posted January 8, 2021 Author Share Posted January 8, 2021 The layout is set in the mid 1970s so will be blue diesels class 25s, 47s, 50s, Westerns and Peaks on a mixture of passenger and freight workings. All will be DCC fitted with as much with sound as possible. Some of the more relevent locos and stock on our Smallwood layout will also see service at Norgrove 1 1 Link to post Share on other sites More sharing options...
Reddibus Posted January 12, 2021 Author Share Posted January 12, 2021 (edited) We have spent the last few months refining the design for our Norgrove layout. We started with an eight board configuration that would have been very similar to what we have previously used for our Chilcompton and Oakenshaw exhibition layouts. This arrangement gives boards three feet long which makes it difficult to fit self contained folding legs to them to support the layout. We revised the board design to use four boards two 5ft x 21/2 ft and two that are 4ft square. This also cuts down the numbers of baseboard track joints to hopefully make the eventual layout operate more reliably. The attached shows the differences in the baseboard design and how much extra scenery we will be able to create layout configuration.pdf Edited January 6, 2023 by Reddibus pic update 2 Link to post Share on other sites More sharing options...
Reddibus Posted February 9, 2021 Author Share Posted February 9, 2021 (edited) To start the process of constructing the new layout we had the opportunity to make use of some 8ft x 4ft sheets of otherwise scrap 12mm MDF to construct a full sized mock up of the layout in terms of baseboard design. This has allowed us to refine the layout design. The picture shows a view down the layout Edited February 15, 2024 by Reddibus pic update Link to post Share on other sites More sharing options...
Reddibus Posted February 9, 2021 Author Share Posted February 9, 2021 (edited) The following pictures show a journey down the layout Edited January 6, 2023 by Reddibus pic update 5 Link to post Share on other sites More sharing options...
Reddibus Posted March 12, 2021 Author Share Posted March 12, 2021 (edited) We have moved on significantly with the layout and have now made the permanent boards out of plywood and are preparing to do some track laying.These two views show recent progress. As we gone along we have painted everything in a grey base coat though the white areas in the pictures are the roads which we have formed from hardboard Edited January 3, 2023 by Reddibus pic update 11 Link to post Share on other sites More sharing options...
Reddibus Posted March 15, 2021 Author Share Posted March 15, 2021 (edited) We have now got all the cork underlay down which can be seen on this view down the layout ready for the track Edited February 14, 2024 by Reddibus pic update 2 Link to post Share on other sites More sharing options...
Michael Hodgson Posted March 15, 2021 Share Posted March 15, 2021 No crossover anywhere between Up & Down main lines. That must be unusual, but I suppose it helps reliability by avoiding any issues with autoreversers and at least you can run in one direction if there's an electrical fault on the other. I used to live and work in Northfield in the early 70s. The train service was abysmal - one or two in the morning or evening. No booking office of course, but I used to get proper Edmundson tickets from Northfield at Longbridge station (closed, but the booking office was still open as it made up staff wage packets for a large area) Link to post Share on other sites More sharing options...
Reddibus Posted March 15, 2021 Author Share Posted March 15, 2021 Hi Micheal Yes there will be no physical connection between the up and down lines. At exhibitions we have found with our other exhibition layouts having on operator in each direction means they are effectively running two self contained layouts. Both our Chilcompton and Oakenshaw layouts use Midland Railway practise of having a trailing cross over where freight trains were reversed into the goods yards. At exhibitions most of the spectators just want to see trains running and are not interested in movements that bring the rest of the layout to a stand. There will be a single island platform just like Northfield used to be in the mid 70s pre Cross City line with a bus shelter on the platform. On our layout the end with the station building will look more like a mirror image of the arrangement at Bournville. The plan is for a Midland Railway building like the one that used to be at Bournville not like the current 1970s rebuild 1 Link to post Share on other sites More sharing options...
Reddibus Posted March 21, 2021 Author Share Posted March 21, 2021 (edited) Latest progress on the layout with around 85% of the track laid Edited February 14, 2024 by Reddibus pic update 2 Link to post Share on other sites More sharing options...
Reddibus Posted March 21, 2021 Author Share Posted March 21, 2021 (edited) Another update picture Edited February 14, 2024 by Reddibus pic update 3 Link to post Share on other sites More sharing options...
Reddibus Posted March 21, 2021 Author Share Posted March 21, 2021 (edited) Picture update Edited February 14, 2024 by Reddibus pic update 2 Link to post Share on other sites More sharing options...
Reddibus Posted March 21, 2021 Author Share Posted March 21, 2021 (edited) Picture update of progress Edited February 14, 2024 by Reddibus pic update 3 Link to post Share on other sites More sharing options...
Reddibus Posted March 21, 2021 Author Share Posted March 21, 2021 (edited) Layout update Edited February 14, 2024 by Reddibus pic update 3 Link to post Share on other sites More sharing options...
Reddibus Posted March 30, 2021 Author Share Posted March 30, 2021 (edited) We have now reached a significant milestone with Norgrove - we have now laid all the track Edited February 14, 2024 by Reddibus pic update 4 Link to post Share on other sites More sharing options...
Reddibus Posted April 8, 2021 Author Share Posted April 8, 2021 (edited) A few trains that will run on Norgrove Edited February 14, 2024 by Reddibus pic update 3 Link to post Share on other sites More sharing options...
Reddibus Posted April 8, 2021 Author Share Posted April 8, 2021 (edited) more trains Edited February 14, 2024 by Reddibus pic update 5 Link to post Share on other sites More sharing options...
Reddibus Posted April 8, 2021 Author Share Posted April 8, 2021 (edited) more tains Edited February 14, 2024 by Reddibus pic update 4 Link to post Share on other sites More sharing options...
Reddibus Posted April 23, 2021 Author Share Posted April 23, 2021 (edited) The platforms start to take shape. On the left is the one for the parcels depot. This modelled with concrete sides and tops. Whereas the one on the right is the main station platform. As yet to gain a top and sides. With both platforms we have used the peco platform sides. We file the back of them flat and glue them to a timber frame Edited February 14, 2024 by Reddibus pic update 4 Link to post Share on other sites More sharing options...
Reddibus Posted May 17, 2021 Author Share Posted May 17, 2021 With all of the track laid we are now staring to look at some of the key structures. The station will have a single island platform with a subway at each end to access it. We have made a start on one of the subways We have made the stairs from strips of MDF that have been cut to size as shown in picture 1. Picture 2 shows the hole in the baseboard where the stairs fit on the platform end Picture 3 - the hole in the front of the baseboard where the subway from the stairs will end up 3 Link to post Share on other sites More sharing options...
Reddibus Posted May 17, 2021 Author Share Posted May 17, 2021 Another project we are working on are the oil storage tanks for the oil terminal we are creating for the layout. The tank on the left is the raw plastic pipe and the one on the right has been clad in plasikard to for the tank detail. Getting information on how these tanks are constructed is proving difficult and we would welcome any detail readers might have 2 Link to post Share on other sites More sharing options...
Reddibus Posted July 29, 2021 Author Share Posted July 29, 2021 (edited) The following pictures show the latest progress with Norgrove Edited February 14, 2024 by Reddibus pic update 6 Link to post Share on other sites More sharing options...
Reddibus Posted October 31, 2021 Author Share Posted October 31, 2021 (edited) We have made some more progress on the layout. The large factory at the rear of the layout nearly has all of its roof on and some progress has been made with the oil terminal storage tanks. All the sidings now have buffer stops Edited January 6, 2023 by Reddibus pic update 6 Link to post Share on other sites More sharing options...
Reddibus Posted February 3, 2022 Author Share Posted February 3, 2022 (edited) The parish church for our Norgrove layout which is totally scratch built using thick card shell covered in plastikard Edited January 6, 2023 by Reddibus pic update 4 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now