Stephen Freeman Posted July 25, 2021 Share Posted July 25, 2021 Good Morning, I thought I would start a new thread separate from the one on signals to mainly concentrate on Handbuilt trackwork and Templot. I am just starting with a new project, which features Interlaced pointwork. It is to be to EM Gauge with scale thickness plywood timbers, 4 bolt chairs and standard Nickel Silver Bullhead rail. (I would normally use Hi-Ni). Having received some prototype drawings, the next job was to try and re-create it in Templot. In the end I settled for a standard type of turnout with the timbering turned off and then added some plain track superimposed with the rails turned off. I ended up with the result seen below. Next thing is to add the rail etc and move onto the slips that will be needed. I have already printed off the templates and positioned the timbers. Next to add the rails etc. 3 Link to post Share on other sites More sharing options...
hayfield Posted July 25, 2021 Share Posted July 25, 2021 1 hour ago, Stephen Freeman said: Good Morning, I thought I would start a new thread separate from the one on signals to mainly concentrate on Handbuilt trackwork and Templot. I am just starting with a new project, which features Interlaced pointwork. It is to be to EM Gauge with scale thickness plywood timbers, 4 bolt chairs and standard Nickel Silver Bullhead rail. (I would normally use Hi-Ni). Having received some prototype drawings, the next job was to try and re-create it in Templot. In the end I settled for a standard type of turnout with the timbering turned off and then added some plain track superimposed with the rails turned off. I ended up with the result seen below. Next thing is to add the rail etc and move onto the slips that will be needed. I have already printed off the templates and positioned the timbers. Next to add the rails etc. Stephen Sometime ago a late friend asked me to build an interlaced turnout for him, he modelled one of the Scottish regions and in the absence of and exact plans I sourced these below Whilst North Eastern practice rather than the company he modelled for him it was near enough, built to P4 standards as he was an active member of the North London Group Slightly different design with timbers through the first part, then sleepers 2 Link to post Share on other sites More sharing options...
RMweb Premium martin_wynne Posted July 25, 2021 RMweb Premium Share Posted July 25, 2021 (edited) By coincidence, John Palmer has just now posted a Templot .box file for a fully customised NBR interlaced turnout. Download from: https://www.scalefour.org/forum/viewtopic.php?p=85434#p85434 It's in P4 -- use the convert group function to convert it to other gauges and scales (select the match original option). Martin. Edited July 25, 2021 by martin_wynne 2 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now