RMweb Premium Andy Kirkham Posted August 15, 2021 RMweb Premium Share Posted August 15, 2021 In these photos of Bromyard, I notice that a length of the platform edge has been removed.Clearly this is done in recognition that the full length of the platform is no longer required, but I wonder what economy is actually achived by physically degrading the platform edge, especially as the surface of the platform appeared to be still maintained in immaculate condition. And why do it to one platform but not the other? I've also seen this done at stations on the Gloucester-Hereford line. 4 Link to post Share on other sites More sharing options...
RMweb Gold The Stationmaster Posted August 15, 2021 RMweb Gold Share Posted August 15, 2021 Probably done to avoid the cost of repairs - hence only done on one platform and not both. 1 6 Link to post Share on other sites More sharing options...
LBRJ Posted August 15, 2021 Share Posted August 15, 2021 It looks like it has all been done with quite some care and attention, whatever the reason was.. I wonder if the paving was thought to be " Of better use elsewhere" Link to post Share on other sites More sharing options...
RMweb Premium uax6 Posted August 15, 2021 RMweb Premium Share Posted August 15, 2021 Theres probably a host of reasons for removing the copers, but its probably down to the fact why maintain them when the platform isn't in use, removing them reduces 'gauge conflict' if something moves... Andy G 1 3 Link to post Share on other sites More sharing options...
RMweb Gold TheSignalEngineer Posted August 15, 2021 RMweb Gold Share Posted August 15, 2021 20 minutes ago, LBRJ said: It looks like it has all been done with quite some care and attention, If the copings are taken off it is necessary to take of the oversail courses of bricks as well otherwise those bricks may become loose and fall onto the track 4 Link to post Share on other sites More sharing options...
LBRJ Posted August 15, 2021 Share Posted August 15, 2021 Like I said, It is being done with quite some care and attention. It is not just been demolished and lets see what happens, which was just occasionally the case back in the day..... Link to post Share on other sites More sharing options...
Michael Hodgson Posted August 16, 2021 Share Posted August 16, 2021 It saves on the cost of whitewashing the platform edge? The second photo gives interesting modelling detail - they haven't removed the coping stones all the way to end. They've kept the ones by the water crane. The platform surfaces are not of a uniform material - they have used large paving slabs in front of the buildings, small brick-sized ones by the water crane and gravel or tarmac on the other platform Link to post Share on other sites More sharing options...
Nearholmer Posted August 16, 2021 Share Posted August 16, 2021 (edited) Exact match coping stones can be hard to find, so they may have been robbed for work elsewhere, or, as said above, removed to avoid the cost of repair/maintenance. They are heavy and awkward animals to shift about, and it takes a lot of care/skill to get them set exactly, so avoiding fiddling with them can be an attractive option. We may even be looking at a half-completed job, where they’ve been removed temporarily, to attend to the brickwork. Edited August 16, 2021 by Nearholmer 2 Link to post Share on other sites More sharing options...
tynewydd Posted August 16, 2021 Share Posted August 16, 2021 If we compare to the 1963 picture from roughly the same position on wikipedia, https://en.wikipedia.org/wiki/Bromyard_railway_station#/media/File:Bromyard_railway_station_1921287_0d209dac.jpg. We can see that this was not a temporary repair - but rather a decision to remove the edge that persisted. I also notice in passing that the wartime white painting of the platform edge is retained on the entire remaining up platform in 1959 but only seems to be present on a very small portion of the down, just near the platform building shelter even then - maybe where the awning protected it. 1 Link to post Share on other sites More sharing options...
Tim V Posted August 16, 2021 Share Posted August 16, 2021 I thought it was following frost damage. The platforms got shortened as it was cheaper than repairing the whole length. Link to post Share on other sites More sharing options...
RMweb Gold The Stationmaster Posted August 16, 2021 RMweb Gold Share Posted August 16, 2021 7 hours ago, Michael Hodgson said: It saves on the cost of whitewashing the platform edge? The second photo gives interesting modelling detail - they haven't removed the coping stones all the way to end. They've kept the ones by the water crane. The platform surfaces are not of a uniform material - they have used large paving slabs in front of the buildings, small brick-sized ones by the water crane and gravel or tarmac on the other platform Mixtures like that were quite usual. At many stations the original paviors used behind the large edge slabs were replaced n by paving slabs over the years although in some cases the paviors survived until closure. and equally - as seen in the second picture, even in earlier slabbing - which was expensive - was never extended over the whole length of some platform. The slabs on the platform slope by the water crane, and those opposite, look to be the stone type which seem to have been the earlier standard on the GWR - definitely in use in the 1920s and they can also be seen in some pre 1914 photos. They were very large and longer and wider than the thicker cast concrete edging slabs which came later (probably from the 1930s onwards?). The stone ones were prone to damage and cracking and I doubt very much if any replacements were available by the 1950s (if not earlier). 1 Link to post Share on other sites More sharing options...
RMweb Gold pheaton Posted August 17, 2021 RMweb Gold Share Posted August 17, 2021 AIUI they were normally removed (from closed stations) to reduce the likelihood of the unmaintained platform fouling the loading gauge, which is what they found at Cheltenham Racecourse platform 2, the foundations were sinking which had rotated the coping stones close to fouling the loading gauge (which is why the platform had to be rebuilt) 1 1 Link to post Share on other sites More sharing options...
jointline Posted August 17, 2021 Share Posted August 17, 2021 This rather bad picture I took in 1962 shows the vegetation already established, and would probably almost foul the passenger stock. But I think (although don't know for sure) that the railcar never went (was allowed?) further along, it just reversed. Somebody will know better than me! 7 Link to post Share on other sites More sharing options...
Helmdon Posted August 18, 2021 Share Posted August 18, 2021 The SVR did it at Eardington in preservation. Left a small section to allow passengers on/off if necessary and then cut back the rest. In that case it was to stop the loading gauge being fouled as described above, which was a pressing concern given the need to really attack Eardington Bank without pausing (ideally). 1 1 Link to post Share on other sites More sharing options...
Arun Sharma Posted August 18, 2021 Share Posted August 18, 2021 It has also been done to the ex-WCML platforms at Carnforth 2 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now