Jump to content
 

Glen Gillie, Loch Inch & Bridge of Muir


trains12
 Share

Recommended Posts

Hi Peter

Been a very useful two evenings watching you get the cork, track and ballast down, you make it look to easy but i'm sure there's more to it than first meets the eye. Got templot up and running on my PC at home now so will transfer my ideas for the new layout to that over the next few evenings so i can get started with the track building. I noticed your using SMP track, is that in preferance to C&L or are they much the same?

 

Maybe see you at the weekend.

Ray.

 

Hi Ray

 

Have you started a new thread for your New Layout and have you came up with a name for it yet...

 

Jamie

  • Like 1
Link to post
Share on other sites

Hi All

 

Some Progress as you can see from Peter's Photo's...

 

These are all Photo's of Peter's Step By Step Progress

 

Enjoy

 

post-5212-0-18970100-1346112899_thumb.jpg

 

post-5212-0-12748200-1346112906_thumb.jpg

 

post-5212-0-51465000-1346112925_thumb.jpg

 

post-5212-0-17387200-1346112935_thumb.jpg

 

post-5212-0-82203700-1346112943_thumb.jpg

 

post-5212-0-46898200-1346112955_thumb.jpg

 

post-5212-0-74088700-1346112965_thumb.jpg

 

post-5212-0-21496500-1346112982_thumb.jpg

 

post-5212-0-80948400-1346112992_thumb.jpg

 

post-5212-0-73501700-1346113004_thumb.jpg

 

Comments are welcome...

 

Jamie

  • Like 4
Link to post
Share on other sites

Hi Again

 

Some more step by step progress of the next board...

 

post-5212-0-61559800-1346113352_thumb.jpg

 

post-5212-0-55058100-1346113359_thumb.jpg

 

post-5212-0-19127500-1346113367_thumb.jpg

 

post-5212-0-83652700-1346113375_thumb.jpg

 

post-5212-0-38191500-1346113403_thumb.jpg

 

post-5212-0-56299200-1346113412_thumb.jpg

 

post-5212-0-78126800-1346113426_thumb.jpg

 

post-5212-0-57357500-1346113436_thumb.jpg

 

post-5212-0-09005900-1346113446_thumb.jpg

 

post-5212-0-75240600-1346113484_thumb.jpg

 

All Comments Welcome, i'm sure Peter can give Advice if you need to questio his How-To's

 

Jamie

  • Like 4
Link to post
Share on other sites

Hi All

 

These are photos of the progress taken the next morning allowing the glue to go off and then all was left to do was to Hover up the bits that didnt stick and will be all recyled later on for other track still to be laid down...

 

post-5212-0-04143600-1346116593_thumb.jpg

 

post-5212-0-69475800-1346116599_thumb.jpg

 

post-5212-0-44123500-1346116616_thumb.jpg

 

post-5212-0-68118100-1346116625_thumb.jpg

 

post-5212-0-90440600-1346116634_thumb.jpg

 

post-5212-0-30152900-1346116643_thumb.jpg

 

All Comments welcome and your views...

 

Jamie

  • Like 3
Link to post
Share on other sites

Hi All

 

These are the few photos I have of the bridge progress that will be placed just between the Rock Tunnel and the Foot Bridge of the small Halt Station, the Bridge will be a good focus Point as Peter as plans to put a waterfall behind in the back drop...

 

post-5212-0-88105700-1346118301_thumb.jpg

 

post-5212-0-94827100-1346118308_thumb.jpg

 

This is the Point Peter is at... but he has been contantly moving on and real progress and the layout is now takeing good shape...

 

Any Comments, Remards would be Welcome for Peter hard work in the progress for all of us to see...

 

Jamie

  • Like 4
Link to post
Share on other sites

Taking shape nicely Peter. I'm tied up with work this weekend so wont be able to get over for a bit to check your progress and pick up some more tips. Been working on my layout plan yesterday but it's become a case of too much track and not enough baseboard. In need of a rethink!

 

Ray.

  • Like 2
Link to post
Share on other sites

Hi All

 

Well Peter as Managed to fetch the Station board up from his Unit and attach it to the end or start of the new boards...

 

post-5212-0-39961300-1346187352_thumb.jpg

 

post-5212-0-23512500-1346187361_thumb.jpg

 

post-5212-0-44904000-1346187369_thumb.jpg

 

post-5212-0-04566800-1346187378_thumb.jpg

 

 

Photos below is where the Cork gets sanded down back to the first lower as it's a siding which was always on a lower level than main line to stop wagons rolling backwards back on to main line...

 

post-5212-0-20984500-1346187389_thumb.jpg

 

post-5212-0-75889500-1346187400_thumb.jpg

 

All Remarks and comments welcome...

 

Jamie

  • Like 4
Link to post
Share on other sites

Hi All

 

These were some more photos of the Bridge Construction just the other side of the Rock Tunnel and the Halt, small station. As I took more photos today that were a bit more clearer that previous shot of the Bridge...

 

post-5212-0-55392500-1346187840_thumb.jpg

 

post-5212-0-87497500-1346187848_thumb.jpg

 

post-5212-0-55580900-1346187859_thumb.jpg

 

post-5212-0-80832600-1346187866_thumb.jpg

 

post-5212-0-94058400-1346187879_thumb.jpg

 

post-5212-0-77597700-1346187887_thumb.jpg

 

post-5212-0-84107400-1346187918_thumb.jpg

 

post-5212-0-99473200-1346187930_thumb.jpg

 

Your Comments welcome...

 

Jamie

  • Like 4
Link to post
Share on other sites

Hi Again

 

When Peter Matched up the Station Board with the new board there was a slight height different between the two, the newer boards were slightly lower, which meant Peter had to heighten the track bed with another layer of cork which would need sanding down later on after the clue was set....

 

post-5212-0-81294900-1346188976_thumb.jpg

 

post-5212-0-49417900-1346188985_thumb.jpg

 

 

 

Some more photos of todays progress and the Slipway building...

 

post-5212-0-73066900-1346188992_thumb.jpg

 

post-5212-0-40205600-1346189002_thumb.jpg

 

post-5212-0-56134000-1346189013_thumb.jpg

 

post-5212-0-29187000-1346189028_thumb.jpg

 

post-5212-0-72194400-1346189040_thumb.jpg

 

post-5212-0-52438600-1346189059_thumb.jpg

 

post-5212-0-83648200-1346189069_thumb.jpg

 

Comments Welcome

 

Jamie

  • Like 2
Link to post
Share on other sites

Hi All...

 

Next Peter need to separate each board from the next board, so first few photos are of him soldering down the track to the copper clad which was glued down a day or two ago... and then drill a small 1/2mm hole for the droppers, these are the 3" or so, these rods that will be bent over by about 2-3mm at the one end of the rod to stop it dropping right the way through the pre drilled hole and then soldered to the copper clad...

 

The one photo as been repeated with Red Rings round them to point out where the rod of been soldered...

 

post-5212-0-82085000-1346192658_thumb.jpg

 

post-5212-0-37846500-1346192666_thumb.jpg

 

post-5212-0-76447200-1346192680_thumb.jpg

 

post-5212-0-48851000-1346192702_thumb.jpg

 

post-5212-0-58199600-1346192941_thumb.jpg

 

post-5212-0-54244700-1346193023_thumb.jpg

 

post-5212-0-89698300-1346193064_thumb.jpg

 

post-5212-0-74189300-1346193074_thumb.jpg

 

post-5212-0-20714200-1346193106_thumb.jpg

 

Any Question on Peter's How-To's are welcome or any advice that Peter can pass on are all Welcome...

 

Jamie

  • Like 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...