devondynosoar118 Posted December 24, 2012 Share Posted December 24, 2012 Well done. Still not managed to take pictures of those faller kits have I! Link to post Share on other sites More sharing options...
Coldgunner Posted December 27, 2012 Author Share Posted December 27, 2012 I've been working on the layout today. Greslington has, after many months, felt the cool touch of a paintbrush covered in PVA. It appears one of the connected shed roads is causing a short on the bay platform when a particular points configuration is used so I have disconnected the sheds until resolved. I did take the time to set up an electrical connection in the rearmost siding that has been disconnected since the dcc modifications. I'll need to attack the layout with a hoover soon, try get all the 'bits' off it. Some more teaks are on their way to me as well, though can't for the love of god find anyone who has a brake coach in stock. Pics to follow later today. Link to post Share on other sites More sharing options...
Coldgunner Posted December 27, 2012 Author Share Posted December 27, 2012 DSCF4114 by Coldgunner, on Flickr This is the new scene. My wiring will soon disappear once I've throughly tested it to make sure all is good, it will be covered in heavy grass. Link to post Share on other sites More sharing options...
Coldgunner Posted January 19, 2013 Author Share Posted January 19, 2013 I was messing about with the slow shutter function on the camera earlier and here a a few results. DSCF4213 by Coldgunner, on Flickr DSCF4215 by Coldgunner, on Flickr DSCF4211 by Coldgunner, on Flickr DSCF4193 by Coldgunner, on Flickr DSCF4189 by Coldgunner, on Flickr Link to post Share on other sites More sharing options...
Coldgunner Posted February 25, 2013 Author Share Posted February 25, 2013 Given the progress on the O gauge project, I decided to switch back for a little running session and I wish to increase the size of the fleet for Greslington. Stay tuned... Link to post Share on other sites More sharing options...
Coldgunner Posted February 27, 2013 Author Share Posted February 27, 2013 LMS 5020 will be joining the fleet! Although having a play the other night, there is still a lingering short somewhere that I need to track down before the wiring is finished... Link to post Share on other sites More sharing options...
Coldgunner Posted May 14, 2013 Author Share Posted May 14, 2013 Dear, dear, with the O gauge project emerging, I've not been able to even play with Greslington, let alone do any modelling on it. LMS 5020 and LNER 2750 are the current fleet, I can't seem to resolve the problem I have with DP1 and my other loco's are too difficult for DCC conversion. I have a plan now for completing the wiring. Once I've done that I can place the engine shed back down and get the lighting operational, as its been sitting dormant since installation. Link to post Share on other sites More sharing options...
Coldgunner Posted July 24, 2013 Author Share Posted July 24, 2013 DP1 is going to go back to Bachmann for a fresh service, can't work out whats going wrong with the poor thing. I've had a few running sessions on Greslington lately, with the O and OO gauge taking a lot of my time I've not been able to work on it. Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.