Stuart-AU Posted February 6, 2012 Share Posted February 6, 2012 HI... I plan on building a small OO layout based on the 2mm FS "Ley Hill" , I have up scaled it to OO using peco code 100 track as I had it on the shelf. Control will be MERG Cbus. I hope to make a start on the baseboards this week-end. Stuart-AU Ley Hill on Youtube http://www.youtube.com/watch?v=ZpgolWb9oCc&feature=related Link to post Share on other sites More sharing options...
definate maybe Posted February 7, 2012 Share Posted February 7, 2012 Im not aware of the layout you mention that it is based on Is it a yard or station? have you got an era your planning to model in? Is it continuous or end2end? it looks an interesting trackplan but i cant quite figure how it fits into the overall picture Link to post Share on other sites More sharing options...
d600 Posted February 8, 2012 Share Posted February 8, 2012 Hi that layhill layout looks very good in the video do you know the size of the layout,i await progress on your oo version. cheers Link to post Share on other sites More sharing options...
definate maybe Posted February 9, 2012 Share Posted February 9, 2012 looks a nice layout - hope you will be able to keep us regularly updated. Are you going for a similar era/ region? Link to post Share on other sites More sharing options...
Stuart-AU Posted February 19, 2012 Author Share Posted February 19, 2012 HI.. Well while I have been waiting for some track and points I built and tested the MERG Cbus system, after a few small problem (My fault) I can program and run a loco via JMRI using WIFI. WOW.. Still have to build and test the other modules to control the points and signals. More later. Stuart-AU Link to post Share on other sites More sharing options...
Stuart-AU Posted February 25, 2012 Author Share Posted February 25, 2012 HI Campers Well not much done to the layout but I did recive my Bachmann 3F loco which I chipped and took to Alan's layout for a test run.. It ran very smooth and will b a great switching loco.. More later Stuart-AU Link to post Share on other sites More sharing options...
Stuart-AU Posted March 26, 2012 Author Share Posted March 26, 2012 Hello.. Well been busy with other stuff but finally got the baseboards built. Now I can get down to laying some track and do the wiring. More Later Stuart-AU Link to post Share on other sites More sharing options...
Stuart-AU Posted March 31, 2012 Author Share Posted March 31, 2012 HI.. Well I have have laid all the track on the main section of the baseboards. Next job is to wire for DCC and add the point control to the layout. More later Stuart-AU Link to post Share on other sites More sharing options...
Stuart-AU Posted April 28, 2012 Author Share Posted April 28, 2012 HEY, just a quick update.. I have been busy with training of the large plant type, so not much has been done but I decided to an extra point so the cattle dock will be on the other side and become part of the good shed yard plus giving a better flow. I need to order the point so I hope to post some new images later. Thanks Stuart-AU Link to post Share on other sites More sharing options...
Stuart-AU Posted July 5, 2012 Author Share Posted July 5, 2012 Hi This project has been Abandoned due to a house move in 4 weeks time. I have been given a larger space to build the layout and after watching the 5 videos of 'A spring morning at Egloshayle' on youtube I have re-thinked the type of layout I want. I will return. Stuart-AU Link to post Share on other sites More sharing options...
brossard Posted July 5, 2012 Share Posted July 5, 2012 Stuart, I love Ley Hill! Very inspiring as I'm struggling to get inspiration for a small layout of my own. Thanks for that and good luck with the new one. John Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.