spenc Posted June 17, 2012 Share Posted June 17, 2012 Hi I'am building my layout Spenford Road and i need some point rodding to go from point at bottom picture and the two points at top of picture to a ground frame to the left of the two points at top.The Question is they a manifacture who makes them or do i make my own if the latter what size rodding will i need. Thanks Steve Link to post Share on other sites More sharing options...
spenc Posted June 17, 2012 Author Share Posted June 17, 2012 Hi Mickey Thanks for that Steve Link to post Share on other sites More sharing options...
rcf Posted June 18, 2012 Share Posted June 18, 2012 also model signal engineering www.modelsignals.com Link to post Share on other sites More sharing options...
spenc Posted June 18, 2012 Author Share Posted June 18, 2012 Hi rcf Thank you for that i will have a look. Steve Link to post Share on other sites More sharing options...
RMweb Gold RedgateModels Posted June 19, 2012 RMweb Gold Share Posted June 19, 2012 The MSE/Wizard Models items work out MUCH cheaper than the C&L, although you can make working rodding if you so choose with the C&L components. Me, I will be using MSE stuff as I'll be ordering the signals etc at the same time for Fourgig East You're going to hate me, but have you also considered the need for facing point locks? if you have a facing point on a main running line it might need one in the real world .... Link to post Share on other sites More sharing options...
spenc Posted July 3, 2012 Author Share Posted July 3, 2012 Hi RedgateModels The line through the platform is up/down branch middle line is run round loop. Line to top of picture left used to be part of main line now only serves to clay works.The line bottom left is short siding will i need one still. Thanks Steve. Link to post Share on other sites More sharing options...
RMweb Gold beast66606 Posted July 4, 2012 RMweb Gold Share Posted July 4, 2012 Hi RedgateModels The line through the platform is up/down branch middle line is run round loop. Line to top of picture left used to be part of main line now only serves to clay works.The line bottom left is short siding will i need one still. Thanks Steve. Looking at the photo you will need an FPL on the facing points leading to the platform - if you post a plan we can check. Link to post Share on other sites More sharing options...
RMweb Gold RedgateModels Posted July 4, 2012 RMweb Gold Share Posted July 4, 2012 Thanks Dave for bailing out this signalling novice a little knowledge can be dangerous ....... Link to post Share on other sites More sharing options...
spenc Posted July 4, 2012 Author Share Posted July 4, 2012 Hi Beast66606 & RedgateModels Just to let you know there will be no signals just like the layout how Lapford is but the one part of the old main line will go to a clay works.Got no proper plan so heres one i drawn hope this helps. Steve Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.