Mr Pix Posted December 16, 2012 Author Share Posted December 16, 2012 Hi Here is my attempt at one half of some coal blending bunkers that will placed at the rear of the layout. Conveyors (inlet and outlet) will be added later on at right angles when more progress and planning is made in this area of the layout .The bunkers at scunthorpe have been loosely used as a protatype. I think the roof housing weathering needs to be tonned down a bit ? Jez. Link to post Share on other sites More sharing options...
Arthur Posted December 17, 2012 Share Posted December 17, 2012 Jez, Looking good, yeah, I'd agree about toning down the top a bit, wants an overall dusting of something. Arthur Link to post Share on other sites More sharing options...
JeffP Posted December 19, 2012 Share Posted December 19, 2012 For the coal-handling plant, the dominant colour is...black, surprise surprise. But it also gets liberally caoted with a light buff from the Ore preparation plant, as does everything within radius. My mate came back with blast-furnace charges:(this is per 8-hour shift, Scunthorpe blast): Sinter: 1405.43 tonne Ore as pellets: 594 tonne, Coke: 367.5 tonne. No limestone, it's in the sinter. Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.