Jump to content
 

Steel Works


Mr Pix

Recommended Posts

Hi

 

Here is my attempt at one half of some coal blending bunkers that will placed at the rear of the layout. Conveyors (inlet and outlet) will be added later on at right angles when more progress and planning is made in this area of the layout .The bunkers at scunthorpe have been loosely used as a protatype.

 

I think the roof housing weathering needs to be tonned down a bit ?

 

Jez.

post-4726-0-51010700-1355688806_thumb.jpg

post-4726-0-80628700-1355688835_thumb.jpg

Link to post
Share on other sites

For the coal-handling plant, the dominant colour is...black, surprise surprise.

 

But it also gets liberally caoted with a light buff from the Ore preparation plant, as does everything within radius.

 

My mate came back with blast-furnace charges:(this is per 8-hour shift, Scunthorpe blast):

Sinter: 1405.43 tonne

Ore as pellets: 594 tonne,

Coke: 367.5 tonne.

 

No limestone, it's in the sinter.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...