Hi All

 

below are some pics from my HO 3 level layout. Please visit my website trainsinmaltaorg for a full explanation and progress report. Tell me what you really think and any suggestions are more than welcome.

 

regards,

 

Henry

post-18573-0-43678200-1362309976.jpgpost-18573-0-03764200-1362309981_thumb.jpgpost-18573-0-42788600-1362309984.jpgpost-18573-0-70749600-1362309986_thumb.jpgpost-18573-0-29202000-1362309990_thumb.jpg

Link to post
Share on other sites

  • 1 month later...

UPDATE

 

Hi all

 

Just started work on the mid level section. One track and one road around the mountains, across the ravine over this kitbashed viaduct and down to the lower level. more details on the website

 

Cheers

Hpost-18573-0-54342900-1365340848.jpgpost-18573-0-43534100-1365340849.jpgpost-18573-0-92383800-1365340850.jpgpost-18573-0-27497200-1365340852.jpgpost-18573-0-16279100-1365340853.jpgpost-18573-0-12985800-1365340854.jpgpost-18573-0-00043900-1365340855.jpgpost-18573-0-86589100-1365340856.jpgpost-18573-0-91643200-1365340857.jpg

Link to post
Share on other sites

  • 3 months later...
  • 2 weeks later...

update

 

Central river from the power station ready. On the left will be a small village and on the right my central station. But next is the landscaping near the power station on the left and the fitting of a cable car on the right.

Canal walls are paper models and the pedestrian bridge is scratch built with textured paper.

 

 

 

 

 

post-18573-0-47783400-1375424717_thumb.jpgpost-18573-0-57915900-1375424738_thumb.jpgpost-18573-0-75039400-1375424753_thumb.jpgpost-18573-0-08572900-1375424792_thumb.jpgpost-18573-0-19311200-1375424828_thumb.jpgpost-18573-0-12508500-1375424872_thumb.jpg

Link to post
Share on other sites

  • 2 weeks later...

Just finished installing an old brawa cable car kit on my layout. Heavily modified to suit my needs, it took around 30hrs to fit and adjust. This includes all the buildings and scenery that go with it which is all scratch built. Below a couple of video link of the cars in operation with the trains on the upper level.

 

post-18573-0-00502500-1376153241_thumb.jpg

post-18573-0-09583100-1376153272_thumb.jpg

post-18573-0-65046800-1376153327_thumb.jpg

post-18573-0-20942800-1376153381_thumb.jpg

post-18573-0-51311000-1376153408_thumb.jpg

Link to post
Share on other sites

  • 4 weeks later...
  • 3 months later...

Hi all

I have managed to put in some solid hrs over the holidays hitting a very important milestone. All the rails have been connected. I have managed to iron out all the kinks and the multitude of electrical problems that crop up and the layout is now a go. I have also inserted a turntable and rounhouse in my small yard but have not tested yet. Obviously countless hrs are now needed for ballasting and landscaping but am happy with the result. After the pics click on the video url to see the one complete circuit of the layout. At a very reasonable speed, the train took 8.5 minutes which gives me a lot of space to run a lot of trains.

 

post-18573-0-60203300-1388903188.jpg

 

post-18573-0-94119800-1388903216.jpg

 

post-18573-0-38961100-1388903237.jpg

 

post-18573-0-98822100-1388903256.jpg

Link to post
Share on other sites

  • 3 months later...

Hi

Just a quick update. I have now started to move down from mid level, laying the track with ballast and finishing the scenery. Took a few experiments to get the colour of the ballast I wanted but am happy with the result. Track is not yet weathered. I will do that last in one go.

 

 

post-18573-0-02217200-1397283406.jpg

post-18573-0-84587000-1397283505.jpg

post-18573-0-37270000-1397283550.jpg

post-18573-0-60640900-1397283595.jpg

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...