Brockenhurst's new footbridge & lifts

 

Took a journey break, yesterday. These shots were taken from the Down platform.

 

Photos of new work, at other locations, would be more than welcome.

 

post-7009-0-23857800-1408461441_thumb.jpg

post-7009-0-93265100-1408464017_thumb.jpg

post-7009-0-62686700-1408464215_thumb.jpg

post-7009-0-65368700-1408464336_thumb.jpg

post-7009-0-33563700-1408464888_thumb.jpg

post-7009-0-28563400-1408465017_thumb.jpg

post-7009-0-30413400-1408465058_thumb.jpg

post-7009-0-41098500-1408465166_thumb.jpg

post-7009-0-99334900-1408465316_thumb.jpg

post-7009-0-46580700-1408465738_thumb.jpg

post-7009-0-58495800-1408465809_thumb.jpg

post-7009-0-30461200-1408465930_thumb.jpg

post-7009-0-98986100-1408466129_thumb.jpg

post-7009-0-63384200-1408466372_thumb.jpg

 

Edited 22/08/2014, to add pics. of the previous structure.

post-7009-0-61490600-1408728424_thumb.jpg

post-7009-0-01795700-1408728519_thumb.jpg

post-7009-0-31006600-1408728637_thumb.jpg

post-7009-0-09428900-1408728686_thumb.jpg

 

A list of NR's improvements, planned, in progress and completed, can be found here.

http://www.networkrail.co.uk/improvements/access-for-all/stations

 

All the best,

Ceptic.

Link to post
Share on other sites

Southampton Airport Parkway.

 

New footbridge + lifts. Completed in 2010.

 

post-7009-0-78524600-1408550893_thumb.jpg

post-7009-0-13084000-1408551653_thumb.jpg

post-7009-0-97828500-1408551934_thumb.jpg

post-7009-0-94419000-1408553833_thumb.jpg

post-7009-0-54930900-1408552736_thumb.jpg

 

Replacing the Southern style, pre-cast concrete footbridge at the southern end of the platforms. (Always a hurdle, laden down with luggage, let alone being wheelchair bound)

post-7009-0-12675600-1408554596_thumb.jpg

post-7009-0-33203500-1408554702_thumb.jpg

post-7009-0-05554900-1408554796_thumb.jpg

 

All the best,

Ceptic.

 

 

 

Link to post
Share on other sites

  • RMweb Gold

Lifts and footbridge provided at Marple in 2012, and the bridge that was replaced. 

post-9767-0-73092400-1408563395_thumb.jpg

post-9767-0-73733200-1408563402_thumb.jpg

post-9767-0-27129400-1408563475_thumb.jpg

Photographs C E Steele

 

Seems that the Northern passengers are a bit more hardy than those in the places pictured above, but I suppose if you commute every day in a Nodding Donkey you need to be, and I suppose it is a long way from Westminster and only about 1000 people cross the bridge on an average day.

Link to post
Share on other sites

Lifts and footbridge provided at Marple in 2012, and the bridge that was replaced. 

attachicon.gifMarple Footbridge 1.JPG

attachicon.gifMarple Footbridge 2.jpg

attachicon.gifMarple footbridge - old.jpg

Photographs C E Steele

 

Seems that the Northern passengers are a bit more hardy than those in the places pictured above, but I suppose if you commute every day in a Nodding Donkey you need to be, and I suppose it is a long way from Westminster and only about 1000 people cross the bridge on an average day.

 Aye, Hardy lot, them Northerners. Even that there new footbridge is open to the ellerrements.

Mind you, we've got that there Hardy bloke from Wessex.  :D

Link to post
Share on other sites

No pics, but there's a ton of work going on to provide lifts up to the platforms at Berkhamsted. I'm not certain how they'll be accessed at street level - presumably off the existing subway - but you can see the works at the extreme south end of the platforms.

 

I'm there tomorrow (my mother lives there) so if I can get round by the station I'll try and get a photo or two.

 

Jim

Link to post
Share on other sites

When I first knew Taunton station around 1970 the middle island platforms were out of use,

in the 1980s the Taunton area re-signalling scheme saw them brought back into passenger use albeit with very limited facilities.

The lift up from the subway level was installed in 2007, here is a not very good shot showing the lift building on the left

post-7081-0-59319200-1408967054.jpg

150265 stands in platform 3 waiting to form a service to Cardiff, 150130 on platform 2 is working the 09.00 Cardiff - Plymouth service, 18/9/2013

 

 

edit  and a view of the front of the lift building

post-7081-0-41655600-1409495432_thumb.jpg

seen 27/8/2014

 

cheers