The Ultimate Shed Pt 3 - The under belly...
Welcome to part 3 (it's been a long time coming) of my re-working of a Bachmann 'Shed'!
Work has been non-existent in the past few weeks, however before modeller's block became a problem I had made some good progress with the fuel tank area that it is worth sharing to show progress so far and the standard I'm aiming for in this area.
I made extensive use of the 'Cannon and Co' EMD fuel tank detailing pack - along with various sizes of brass wire (including 0.25, 0.31, 0.9mm).
Reference was made to Brian Daniel's excellent snaps which made detailing up the end of the tank a breeze!
Now 'plastic' has been cut there is no going back so the next step will be to start to fabricate the pipe runs along the chassis frame - which I'm going to build up in stages leaving each sub-assembly loose until I'm sure I've got things in the right order - it's going to be a challenge but I'm looking forward to it.
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now