-
Posts
76 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Everything posted by experimental
-
Hi John. Yes, the model includes the bogies and wheels, and yes they are the normal 26mm, the wheelsets are actually held via a centre support frame so various sizes could be used. I would have to enquire about the postage costs to Australia, I will get back to you on that as soon as I can. Regards Paul
-
Hi All, Any people interested in a 00 gauge POP model, please can you email leadleykits@apt-e.org and I will beging building a order list, ready for when production starts, also gives me an idea what I have let myself in for lol. I will email you with a ticket number, first come , first served . Price is £68 with delivery. Please note , no decals are going to be supplied , but all you really need are PC3 and 4 labels which are shown on the drawings being supplied. Regards Paul
-
Hi All, A little later than promised, but here is prototype 7 completed, minus the HK brake pipes which I forgot to fit lol. The white flecks on some of the photos, are the black PLA catching the light, not a rough finish. I am pretty happy with it, looks the biz next to E train. Any feedback welcome. Regards Paul
-
Hi All, Not much progress this week, work gets in the way of better things, but presently working on Prototype 7 both in 00 and N, so keep the faith.................... When the time comes I am going to get interested parties to email me off web, and I will reply with your ticket number, hope that's fare to everyone interested. Please remember that these are being made to order. Will post some updates by the weekend. Regards Paul
-
Hi, Used black PLA just as it what I had in, going to use grey for the production versions, although I do like it in black, will post some pics when the next prototype is ready. As for payment, was going to issue a queue number, so you only pay when your model kit is ready for posting. I was thinking of using paypal, something I need to look into further. Going to put a section of the website (www.apt-e.org) so everyone knows which kit I am currently working on. Regards Paul
-
Hi all, Not much of an update this week as I have been away driving on the Great Central Railway, but before I left I started work on the cab interiors, new coupler and lowered the ride height a few mm. More progress tomorrow with a bit of luck as I can work all day on the model. Watch this space. Oh, prototype 7 is now under construction using black PLA, very striking. Regards Paul
-
Hi Darren, Thanks for the interest in the model, the answer to your question is "YES", very much so, along with HSFV1 and Lab 4 Hastings. All updates with be posted on here, so keep an eye on progress, been working on the base and the lattice work the past few days, so POP one is nearly there. Regards Paul
-
Hi All, A quick update on the work done this week. 1.Bulkheads reduced in thickness, test printed fine. 2. Redesigned small VIP area in PC3, and made it easier to construct. 3. Corrected bulkhead positions. 4. Corrected window sizes and positions, on side panels and PC3 VIP bulkhead. Still to do.......... See how thin I can make the framework, but keep it strong enough to be handled. HK brakes pipes to add to bogies. Make internal details for large cabins and small VIP area. Its getting there.........................