Jump to content
 

David Todd

Members
  • Posts

    9,131
  • Joined

  • Last visited

  • Days Won

    73

Everything posted by David Todd

  1. P1610708 by David Todd 2012, on Flickr P1610707 by David Todd 2012, on Flickr P1610705 by David Todd 2012, on Flickr P1610703 by David Todd 2012, on Flickr P1610702 by David Todd 2012, on Flickr P1610701 by David Todd 2012, on Flickr
  2. The weather, was reasonable today, this time next week,it could be snowing. I rolled up, around 1030, fresh off the 2nd hourly run of the 61,bus. I stuck around until 1330, bus run home. Had a chat with, ffinybryn, until he was called back. Here a a few, from the time of my visit. All from the top of Shakey Cliff. P1610739 by David Todd 2012, on Flickr P1610736 by David Todd 2012, on Flickr P1610780 by David Todd 2012, on Flickr P1610742 by David Todd 2012, on Flickr P1610722 by David Todd 2012, on Flickr P1610709 by David Todd 2012, on Flickr
  3. No,no, am not there yet, just being fed by our other man on the ground.
  4. Am not able to get there,until 1030 hours this morning. First section to go in soon.
  5. Yes,tmw is on to complete the job. 5am start suit you ? Although, I will have breakfast and turn up around 0930/1000 hours.
  6. An update,underwater elektricery cables. From Dover Marina, Nigel.on Facebook. Dover Marina.com added 2 new photos. Yesterday at 4:52pm · Cable repairs: Update No.3: With Olympic Triton on station, Holyhead Towing's Afon Cefni is being kept busy acting as Guard Vessel and fast transfer boat Holyhead Bay likewise, running between the port and the Triton. The cables comprise the northern most two pairs, known at the time of installation as route one and route two. One pair is British and the other French. Fortunately, the weather hasn't been too bad so far.
  7. Sunrise, this morning. DSC_0140 by David Todd 2012, on Flickr Later,in the day,took a walk out,across the Eastern Cliffs, these,were 1530, today.on the way back. DSC_0247 by David Todd 2012, on Flickr DSC_0249 by David Todd 2012, on Flickr DSC_0252 by David Todd 2012, on Flickr DSC_0268 by David Todd 2012, on Flickr DSC_0304 by David Todd 2012, on Flickr
  8. Nice, Thanks, I reckon you have had a few days to photoshop,the wind and rain, out of the above. http://www.youtube.com/watch?v=8Fr_8bdNnRo&t=7s
  9. I have heard, that the stairs,leading up from the new foot bridge, to the A20 public footpath we're not in the 39.5 million remit to be renewed or repaired.
  10. AN accumulation of events leading to delays,then time, otherwise, if it had been a complete hassle free install, the 3 stair sections would have been fitted.
  11. I tend not to wear that type of thermal underwear, these day's.
  12. Today, 1215 hours, Monday.2.1.17 P1610494 by David Todd 2012, on Flickr P1610495 by David Todd 2012, on Flickr P1610435 by David Todd 2012, on Flickr
  13. At this point, both my cameras performance deteriorated, dramatically due to the rain ingress. P1610423 by David Todd 2012, on Flickr P1610426 by David Todd 2012, on Flickr DSC_0019 by David Todd 2012, on Flickr DSC_0016 by David Todd 2012, on Flickr DSC_0007 by David Todd 2012, on Flickr DSC_0003 by David Todd 2012, on Flickr DSC_0025 by David Todd 2012, on Flickr DSC_0026 by David Todd 2012, on Flickr DSC_0021 by David Todd 2012, on Flickr Left for home, at 1310, as both cameras are rendered useless, for more action. but satisfied, that I had done enough. Apparently, Helcion turned up at 1400, suggesting,that the second span had been removed and was being landed for a second time.
  14. Slinging the second span. P1610391 by David Todd 2012, on Flickr P1610392 by David Todd 2012, on Flickr P1610393 by David Todd 2012, on Flickr P1610401 by David Todd 2012, on Flickr P1610411 by David Todd 2012, on Flickr
  15. Lifting the center section in. P1610309 by David Todd 2012, on Flickr P1610312 by David Todd 2012, on Flickr Trollies away,for second span, P1610315 by David Todd 2012, on Flickr P1610316 by David Todd 2012, on Flickr Back to center section.fitting. P1610372 by David Todd 2012, on Flickr P1610373 by David Todd 2012, on Flickr P1610376 by David Todd 2012, on Flickr P1610383 by David Todd 2012, on Flickr P1610389 by David Todd 2012, on Flickr P1610327 by David Todd 2012, on Flickr P1610335 by David Todd 2012, on Flickr P1610344 by David Todd 2012, on Flickr P1610358 by David Todd 2012, on Flickr P1610361 by David Todd 2012, on Flickr P1610364 by David Todd 2012, on Flickr P1610365 by David Todd 2012, on Flickr P1610371 by David Todd 2012, on Flickr
  16. Meanwhile, back at the ranch, the center section was loaded and troll eyed down. P1610268 by David Todd 2012, on Flickr P1610266 by David Todd 2012, on Flickr While fixings, to the first span. P1610277 by David Todd 2012, on Flickr P1610279 by David Todd 2012, on Flickr Unslinging, P1610280 by David Todd 2012, on Flickr P1610281 by David Todd 2012, on Flickr Center section,is brought in. P1610282 by David Todd 2012, on Flickr P1610283 by David Todd 2012, on Flickr P1610286 by David Todd 2012, on Flickr P1610298 by David Todd 2012, on Flickr P1610300 by David Todd 2012, on Flickr
  17. Either, waiting for the high winds to abate, or adjust the slings, the lift commenced. P1610191 by David Todd 2012, on Flickr P1610192 by David Todd 2012, on Flickr P1610199 by David Todd 2012, on Flickr P1610201 by David Todd 2012, on Flickr P1610205 by David Todd 2012, on Flickr P1610209 by David Todd 2012, on Flickr P1610211 by David Todd 2012, on Flickr P1610213 by David Todd 2012, on Flickr P1610215 by David Todd 2012, on Flickr P1610216 by David Todd 2012, on Flickr P1610217 by David Todd 2012, on Flickr P1610218 by David Todd 2012, on Flickr
  18. The first span is on the trolleys and is being prepped for slinging and lifting. P1610174 by David Todd 2012, on Flickr P1610175 by David Todd 2012, on Flickr This is from the tunnel tops, fog, closing in, with wind and rain. P1610179 by David Todd 2012, on Flickr P1610178 by David Todd 2012, on Flickr P1610181 by David Todd 2012, on Flickr P1610184 by David Todd 2012, on Flickr The span was lifted, off the trolleys,then grounded. P1610186 by David Todd 2012, on Flickr
  19. Sunday morning, New Year's Day, 0500 hour's. Breakfast, left home to walk the 2.5 miles, to the bridge site. Of all the day's, the weather had to kick up, this was the day. Passed the new road layout with it's Smaart traffic lights, not working as yet, on passed the Marina, up the steps, passed P&O, passed Megger. Down through the underpass, up the slope to Megger roundabout. Looking over the wall,to the site offices. P1610165 by David Todd 2012, on Flickr This is the second span, the first span had been lifted and troll eyed, to the bridge site 1/4 mile further on. P1610150 by David Todd 2012, on Flickr P1610151 by David Todd 2012, on Flickr Looking over the Megger roundabout wall, the fog cleared for a minute. The footbridge site, 1/4 mile up, P1610153 by David Todd 2012, on Flickr P1610154 by David Todd 2012, on Flickr P1610158 by David Todd 2012, on Flickr P1610159 by David Todd 2012, on Flickr Stumbling along the now cleared footpath,there is lamposts along this clifftop path,but the council,have had them switched off,except for one. P1610166 by David Todd 2012, on Flickr P1610167 by David Todd 2012, on Flickr P1610170 by David Todd 2012, on Flickr P1610173 by David Todd 2012, on Flickr
×
×
  • Create New...