Jump to content
 

David Todd

Members
  • Posts

    9,131
  • Joined

  • Last visited

  • Days Won

    73

Everything posted by David Todd

  1. Yep..........seems like,I am one of them.............
  2. You mean.........like this................. .or, like this.......... ..........lastly......if you acheive this status........... go......lie down...........
  3. Please..............See post # 37. in this thread..................
  4. These are my principles also.........." it's okay not to get it right first time"................but, can increase,............to double figures..................
  5. 90, seconds,..from gun flash, on Calais cliffs, .........to impact in Dover..............21. miles.
  6. A Naff Company video. About 7 months ago, test run through Dover Priory. Lots of track tranisitions to do, station refurb...........etc,etc.................... http://www.youtube.com/watch?v=DOwKjJHqJKs Naff Video Company
  7. What do you think.? ..................A bricked up tunnel, to nowhere.............? But,I do know what it was for................
  8. http://www.youtube.com/watch?feature=player_detailpage&v=ZLzOEtdGPgI
  9. Dover Mail.................... .have got the video...."Dover and Out"
  10. Moorings......... So,.to a 2nd fit,of the over bridge........... As you will see, it has had an overall coverage,of brick mortar, you may think there is a lot of excess on the brickwork,this is only fine powder residue and requires polishing off. The lighting I am using to take the pics,tends to highlight the powder, the next stage will be couloring the brickwork,this evening.....No doubt,Lofty sr,will attend for a couple of hours. Main body,..........mortar washed............. 1. 2. 3. 2.nd fit,.............mock up 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. A couple of pics,of the proposed platform,2/3, lift and shaft........... 14. The "cutting side" of the overbridge,this is the proposed site of my programming track......outside of Harbour Tunnel. 15. BFn..................
  11. Moorings................. Can any one remember..................... .Was this service,always run with a 73............Did........... MLv's, get to do this service ?. Anyone having pics of Mlv's in and around Dover, I would be most grateful to see them,posted n the General Dover Thread. Mlv's are of great interest to me,as I have 12....... "00", ones, in various liveries.....most to complete building,and paint.
  12. Ernie,.........Thanks for the pictures, one of a kind those pics,...................... So are you saying, in the shunt test,the van switched the points itself..?
  13. Excellent pictures, Simon. Thank for posting....... This is about the time I best remember it.
  14. Continuing with the over bidge sidewalls.............all 4 sides have now been "mortar joint filled". Just requires the excess,removed, then colouring of brcks to begin. The main body of the over bridge brick joint's will be done tomorrow..................... 1. 2. 3. 4. 5. 6.
  15. Details, details.........hmm..........
  16. Some of the real brickwork,on the Priory station side of the over bridge. 1. The end of Priory sidings wall P1040414(1) by David Todd 2012, on Flickr 2. P1040413(1) by David Todd 2012, on Flickr 3. P1040412(1) by David Todd 2012, on Flickr 4. P1040411(1) by David Todd 2012, on Flickr 5. P1040410(1) by David Todd 2012, on Flickr 6. P1040923(1) by David Todd 2012, on Flickr 7. P1050118(1) by David Todd 2012, on Flickr 8. P1050118(1) by David Todd 2012, on Flickr 9. P1050105(1) by David Todd 2012, on Flickr 10. P1050089(1) by David Todd 2012, on Flickr 11. For Jaz.........the trainspotter's view,you asked for............on the model. P1040990(1) by David Todd 2012, on Flickr
  17. Tonight's, pictures of how Dover Priory is.............. . I seem to have more of the layout,on my dining table....... than I do,........on the layout............. . 1. 2. 3. 4. 5. 6. 7. You should have noticed,I temporarlily,replaced the base of platform,2/3,to see hoe it abbutted, to the over bridge. The concrete sidings end walls,have had a brown wash.....also. I can rub out the darker brows on the testpiece sidewall,........for it is not paint........ .
  18. More....... ..done to the..........wall............hmm..........need a lighter brown, The test piece of the sidewall,has been slotted in to it's postion Now, you will see a lot of variant's,.......for I have changed the angle of the lighting,for.... every pic. you see. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
  19. Continuity..................... 1. 2. 3. 4. 5.
×
×
  • Create New...