Jump to content
 

fishytrains

RMweb Gold
  • Posts

    719
  • Joined

  • Last visited

Posts posted by fishytrains

  1. A crude sketch of the proposed extra fiddle yard to go under the main Lilac Grove station board.

    417ed094d796f5870ca0dab654aa25fa.jpg

    Due to the restricted width and slope of the loft where the line descends from the main board to the lower fiddle yard board the drop will need to be unprototypically steep! As it is off scene and will only be a descent, I think this should be fine. The track my come in more than currently shown and climb a little before the loop back to the fiddle yard proper. A second climb can then be made back to the original baseboard level for the train to emerge from the tunnel. This is not drawn to scale, but is designed to give me an idea of what I am aiming for when I eventually get round to doing this. At which point I will find out if it will definitely work!

     

    Any thoughts are gratefully received as I say it is likely to be a long time before this happens at the moment.

     

    MIke

    • Like 1
  2. Two weeks spent in the UK over Christmas - progress on the layout -nil! :O I did manage to run the Class 128 DMU which was a very enjoyable experience. I also discovered that my Class 37 which shorts out on DCC is fine on DC. So the problem is the decoder. May well try the Bachmann 21 pin variety in the summer. The extra fiddle yard might fit in, however, the track will need to go downwards in order to have sufficient space for the curve. The curve is so that the track returns under the baseboard, enabling the extra fiddle yard to go under Lilac Grove station, leaving enough clearance for point motors. That said I might not have the track where the point motors would be needed - more planning to be sorted out. The track will then go back on itself again and climb up to the original baseboard in the tunnel and come out to return to Lilac Grove station. I know what i intend, but explaining it seems difficult. If I get the chance I might draw it out and post a picture!

     

    Main job this coming summer is to wire the other side of the layout and make sure I can get that running as I would like and as I see in the videos other post on RMWeb and also Youtube. At the moment all other plans are dependent on having large amounts of cash available! Ah well back to dreaming!

     

    Happy New Year to all who read this.

     

    Mike

×
×
  • Create New...