Jump to content
 

Rick_Skateboard

Members
  • Posts

    377
  • Joined

  • Last visited

  • Days Won

    2

Posts posted by Rick_Skateboard

  1. My Bachmann/Kernow 37418 arrived today, and it's the first time I've seen one of the new 37s in the flesh.  I'm very pleased with it!   Here's a bit of a photo review.

     

    IMG_8460.jpg.d089f93762c629ce1db66703ca703c1f.jpgIMG_8445.jpg.4ade98aad0bf35583fec73d652cc381d.jpg

    I'm particularly impressed by the detail around the fuel tanks, which is an area the old model was severely lacking in.

     

    I took a few pictures of it with the top off, I was wondering if a body swap would be possible with an older model.  I think the answer is yes, but not easily.  One big difference is that the lights are connected to the chassis by four miniature connectors, so that would have to be worked around.

     

    IMG_8470.jpg.fc15450150917f6e8fa3a005c8b17b7a.jpgIMG_8472.jpg.d8cd045fb87d2a721e5a26150b4695c3.jpgIMG_8469.jpg.f4ecec6b9978bee0abf9328ee8cd98a1.jpgIMG_8474.jpg.cfa8e06beb506660413895f24f86ecaa.jpg  

    Cheers,

     

    Rick

     

     

     

    • Like 11
    • Informative/Useful 1
  2. 5 hours ago, nightstar.train said:

    Probably too much to hope for but I'd love an original 37/6 in EPS livery. Infact I'll take 2, sound fitted. An Intercity swallow 37/4 would be good too to haul the highland sleepers. And one or both of the Royal Scotsman liveried 37/4s. Oooo the possibilities with a 37, nearly endless. Certainly more than one manufacturer can produce, even making 15 variants every 18 months or so. 

     

    I hope they don't do an Intercity Swallow 37/4, but I'd definitely buy a model of any the locos that did carry that livery. 😉

     

    37251 please. 

     

    Rick

    • Agree 2
  3. Hi All,

     

    Has anyone managed to successfully obtain spares from Bemo?  I've emailed a few times and had a mix between being completely ignored and being told to stop sending emails...  Any help appreciated.

     

    Cheers

     

    Rick

     

     

  4. 1 hour ago, Accurascale Fran said:

    Hi everyone,

     

    Thanks for the feedback over the past few days. We have gone back to the factory and have come up with a solution to make the headlamp smaller and therefore we can move it to the correct position. They are going to pull out all the stops to ensure any delay is kept to an absolute minimum but we will have a full and in-depth 37 update in the next few weeks, so keep an eye out for that.

     

    We agree the horn grilles are a little weak point and these was fed back to the factory when we got the initial samples so is an area that is being improved.

     

    Regarding the the handrails. We have consulted scans and survey material this morning, and we are convinced that they are correct, with the angle of the photograph causing the perception that they are not in the right place. 

     

    Hope this helps.

     

    Cheers!

     

    Fran 

    4 minutes ago, Accurascale Fran said:

     

    Hi Scissors,

     

    1/ They should be opaque, this is a factory oversight at the deco sample stage. Have feedbacked to the factory and it will be fixed for production.


    2/ 37043 has only the one nose OHLE warning flash on the driver's side at the No.1 end and none at the No.2 end. This was on the artwork but the factory went overboard, nor used to our bespoke warning flash configurations which change on every loco. Again has been feedbacked to the factory and will be fixed for production.


    3/ The bodyside rad grille colour is very difficult to ascertain accurately on 37043. All our photos suggest they should be blue but if you  can provide evidence to the contrary then we can take another look.

     

    Cheers!

     

    Fran 

     

    Thanks for the updates Fran. 

     

    Aside from the outstanding products at reasonable prices, this is where Accurascale is really leading the field - communication with modellers/customers, and reacting to feedback.  Brilliant.

     

    Cheers

     

    Rick 

    • Like 1
    • Agree 11
    • Thanks 1
  5. 20210117_191211.jpg.66e95858e912fecae671ee53414d7b6d.jpg20210117_191236.jpg.9319740ce853804849917fdd5e64d778.jpg

     

    The MSE lever frame kit has arrived, and I've had a look at the bits.  The cast levers are nice, although the handle and pull rod to the latch could probably be improved on.  I'm not 100% convinved by the frame arrangement, and I may try to modify it or build something else.  The issues are discussed on this thread.

     

     

     

    I've made a start on the locking drawing, but I think I'm making hard work for myself by doing it on paper!  I need to get on with learning CAD.  

     

    20210117_191131.jpg.20cbfe8ab285fb0a3afbe1a17ba79aa4.jpg

     

    I've got hold of some small 12v electomagnetic cabinet latches that might be a start for electrical interlocking, they have about 4mm of movement.  I've also bought a small rotary swith that may be the start of a circuit controller.  

     

    20210117_203700.jpg.1469c577dec69a97cd71a61a60d4830e.jpg

     

    Cheers

     

    Rick

    • Like 4
  6. Hi Michael,

     

    I think Line Clear Release is the correct terminology, it certainly appears on the box diagrams.  According to the book, the shunting key can be released under two condtions; section clear or behind another train.  It is electrically released by the block instrument in both instances, and the block is locked until it is replaced.  Because withdrawing the key locks the block, it would not be possible to get LCR for nos.4/5/11, so they will be electrically locked.  Looking at the interlocking at Dunkeld it appears that the shunt key lever does mechanically lock the starters too, belt and braces!  I agree that 19 should lock 2 and 9 normal.

     

    Cheers

     

    Rick

    • Like 1
    • Thanks 1
  7. 6 hours ago, Nick C said:

    If you've not got passenger trains terminating, you don't need an FPL on those points, as you'd not have any facing passenger movements over them. There's certainly no need for one on 13B (i.e. the points closest to 11)

     

    If a movement needs an FPL engaged, then both the FPL lever and the point lever would be required in the correct position to release the signals. Some companies also required FPLs to be not engaged for trailing movements, for others it doesn't matter. 

     

    So with an FPL on 13A:

     

    1 - 2R, 4R - Requires all associated stop signals clear

    2 - 9N, 10N, 17N, 19N

    3 - 9R, 16N, 17N, 18N, 19N

    4 - 13N, (12N|12R), 15R, 17N

    5 - 15N, 19N

    9 - 

    10 - 9N, 2N

    11 - 13R, (12N|12R), 15R, 16N

    12 - (13N|13R)

    13 - 15R

    16 - 15R, 13R, 12R, 11N

    17 - 15R, 12R, 13N, 4N, 2N

    18 - 9N

    19 - 15N, 5N, 4N, 2N, 3N

    20 - 18R, 19R

     

    I'd recommend downloading the SigScribe software from Modratec and having a play - you can write out the locking in a text file and import it, and it'll then show you what works and what doesn't.

     

    The reason for the home signals in opposing directions locking each other is that the overlaps for 4 & 5 conflict with those for 16/17/19, so if an arriving down train overshot 4, it could potentially hit an arriving up train. You also need to work out where your clearing point is for the single line - most likely, it's 18 - so before a train could be accepted from the next station in the down direction, the route must be clear to that point and points 15 set normal. I think a train for the yard or loop would be brought to a stand at the home and then 15 changed and the minature arms cleared - others more versed in Scottish practice might correct me though.

     

    I'll have a look at the SigScribe software, thanks.  

     

    I see what you mean about the single line clearing point, I hadn't fully appreciated how the operating regulations  would effect the interlocking in that way.

     

    Cheers

     

    Rick

  8. Thanks, I can see the sense in those additions.  12 is the FPL for 13 (that probably isn't clear from my drawing), which is worked as a crossover.  So I've already got 4 locks 12 and 17 locks 12, which in turn locks 13 in either position.  I've also got 11 and 16 being released by 13R and 15R.  Is it right that points release signals, but signals lock the FPL, where provided, rather than the points?

     

    I'm sure you're right about 17 being a miniature arm, I will change it on the next draft.  I don't think any passenger trains will be terminating, so that's not an issue.

     

    Cheers

     

    Rick

  9. 1700111464_BraeintraColour.jpg.45c5a21a138d7d2c95c54f019857040f.jpg1452137213_BraeintraLockingv2.jpg.87fa72a37e823933b88ecff6afb1652a.jpg

     

    Now that I’m happy the layout is mainly correct, I’ve had a go at a locking chart, based on what I’ve read and what I think should lock what logically.  I’m not sure what the relationship between no.2 signal and no.13 and 15 points should be?  Should a train be cautioned at 2 before being allowed to move up to 4 if the points are reversed (ie; not set for that train)?  I suppose the same could be said for signal no.3 if no.9 crossover was reversed and the movement was being signalled towards no.5 and the up platform, but with no.15 was reversed.  Or am I overcomplicating it?  Any comments on the interlocking gratefully received.

     

    I’m also still not sure whether no.17 should be a full size arm or a miniature one?  Or if the post should have both.  It reads up to no.10 which is a shunt disc, can a main arm read to a shunt disc like that?  The down line is permissive, so I think there would need to be a miniature arm, because the track curcuits would lock the main arm if the line ahead was occupied.

     

    The other thing I’m questioning is whether the limit of shunt board is right?  Does it need to be protected by another stop signal (an outer home?), or is it just protected by the block?

     

    Cheers

     

    Rick 

  10. Ok! Thanks. I'm surprised it involved passing signals at danger, but I suppose that actually makes sense so that there's no confusion between a shunt and a movement through the section.  Do you know if the signalman would have given a yellow flag to start the move, or just given verbal permission to move when ready when handing over the shunt token?  I assume the interlocking would allow the shunt back out of the section (into the station or yard) to be signalled normally?

     

    Cheers

     

    Rick

  11. Thanks again for the replies, it’s been a really interesting discussion. 

     

    I always think it’s good to be able to find a real life example of something you want to model, and I think Dunkeld is the example to follow for the down end of Braeintra.  For that reason, I think I will stick with no.11 reading straight into the section (LCR), and no shunt ahead arms on no.4 or no.5. 
    I haven’t found a real life example of a shunt ahead arm on tokenless block in Scotland.

     

    8 hours ago, The Stationmaster said:

    Quite what the Shunting Lever at Dunkeld does is unclear to me but in theat lever frame photo there is obviously an interlocking/acceptance lever of some sort (because of its colour) and it is noticeable on the Dunkeld diagram that that there is a Shunting Lever in one direction and a shunting key in the opposite direction.  Their numbering might suggest that the Shunting Lever is used in order to make a shunt past Signal No.5 and the Shunting Key could possibly be involved with a movement in the opposite direction but it does seem over-complicated and might well be something that was done in Scotland to achieve a similar sort of flexibility to that offered by the old Electric Token etc Regulations or to avoid problems with resetting the block after a shunt had been made?

     

    I see what you mean about the diagram referring to a shunt lever and a shunt key, but in the picture of the lever frame below you can see that they both appear exactly the same in reality.  I wonder if the pulling of the two levers has different effects on the interlocking?  Also worthy of note is the white collars that denote a lever released by the block – which includes disc no.12.

     

    Dunkeld frame

     

    I have a question about how the signals work with the shunt token?  The Forbes Alexander booklet on Scottish Tokenless Block states that as no physical token is provided, a train must never enter the single line without the clearance of the section signal, as that is the driver’s sole authority to proceed, “and its clearance indicates that the line is entirely clear for a running move.  It cannot be used to authorise a shunt”.  He then goes on to mention the shunt token is the solution to this.  What is not clear to me reading it is whether the section signal is cleared for the shunt move once the shunt token is released?  It almost reads like the shunt token is the driver’s authority to pass the section signal at danger for the purpose of a shunt, but I find it hard to believe that is how the arrangement works.  

     

    Cheers

     

    Rick

  12. 12 hours ago, RailWest said:

    It was certainly the case with the 1967 WR installations of TB that shunt signals could read into the section, but were released by the block, as was the case for instance with Nos 4 and 6 at Templecombe.

     

    It looks like Dunkeld & Birnam on the Highland Mainline has a shunt disc that reads into the section, so it must have been allowed on the Scottish Tokenless Block system.  The diagram is below, the disc is no.12.

     

    Dunkeld

     

    https://www.flickr.com/photos/lickeybanker/49676480758/in/faves-120901503@N04/ the disc can be seen just by the bufferbeam of the 37 in this photo, and has an arrow showing that it is for the siding.

     

    Based on that I think I'll keep the no.11 on my layout as it is.  I think if I put a shunt ahead arm under no.4 I'd have to do the same for no.5?

     

    Cheers

     

    Rick

    • Like 2
  13. 6 hours ago, The Stationmaster said:

    Clearly the situation in Scotland was different because as far as I am aware semaphore section signals were retained.  Personally I would be inclined to follow the Lairg example where a relatively modern (semaphore) signal has been installed and a regular shunt movement takes place and provide a Shunt Ahead subsidiary.  

     

    Thanks Mike.  If a shunt disc signal is not sufficient to enter the section on tokenless block, does No.11 on my diagram need to be a full size arm?  Or perhaps it would be better to move the points from the yard back behind no.4, so the disc reads up to a main arm, as Jeremy suggested in a post above.  I guess the shunt disc at Lairg is sufficient to enter the section on ETS working?

     

    6 hours ago, The Stationmaster said:

    On tokenless  - judging by the Regulations - (the set I have doesn't mention shunting 'tokens' but does deal with shunts into the section) there would be a physical release so any associated signal would be released by that.

     

    If my understanding of the Scottish tokenless system is right then the token is released from a lever in the frame.  The lever can only be pulled after a release is given by both boxes.  I’m assuming that pulling the lever would release the physical shunt token and release the signals that read into the block until the token was returned and the release lever put back to normal?  The shunt token lever, no.16, can be seen in this picture of Dalwhinnie.

     

    Lever Frame and Block instruments. Dalwhinnie signal box. 9-6-2017

     

    Below is the diagram as was, although I changed no.17 to a full size arm.  I'll make some more changes.  I've ordered an MSE lever frame kit today to have a look at, and I think I'll probably try to mock up some interlocking in plasticard to start with.

     

    1868615724_BraeintraColour.jpg.fa5cdd587a7feeb0bb1c4d5a837ab890.jpg

     

    Cheers

     

    Rick

  14. I would have assumed that in later days, after Highland Railway perhaps LMS/BR, there would have been some level of electrical locking added to the original arrangement that would lock any signal capable of sending you into the section to the token machine?  Perhaps not though!  I think Lairg must have been resignalled/modified at some point; the signals in the picture I posted are LMS type, not Highland. 

     

    8 hours ago, Jeremy C said:

    I imagine that at Lairg, the signalman blocks back before clearing the shunt ahead signal or before clearing the yard exit disc for a shunting movement, and that neither lever is intelocked with the token instrument.

     

    On the tokenless block system there is a physical shunt token that can be released even if the single line is occupied by a train heading away from you, with agreement with the box at the other end of the section.  Or so is my understanding. 

     

    2 hours ago, SZ said:

    A ground signal can be sufficient to enter and continue through a section.

     

    Thanks, that clears that up.

     

    Based on what has been discussed up to now, I don't know whether my diagram is correct or not, but it does seem similar to the arrangements at Lairg and Dalwhinnie.  In have started writing up a locking chart for the layout as I have drawn it, which I will post when I think it's far advanced enough to warrant scrutiny.

     

    Cheers

     

    Rick

  15. Thanks again for the replies, I had previously wondered if it was a signal to shunt into the section, but I didn't know if that was right or not.  This raises a few more questions, please bear with me!  At Lairg, how would the shunt ahead signal be interlocked with the block, which I assume is ETS?  If there is no signal beyond, does that mean a train departing from the yard is entering the block on the authority of the shunt disc only - obviously with the staff too?

     

    Does this mean I should have a shunt ahead arm under No.4 on my diagram? And if so, does that work with tokenless block?

     

    Another question I've been thinking over is the bracket signal I've got as the up home on my diagram (No.19/17/16) drawn correctly? Should 17 be a main arm? Or should 17 and 16 be miniature arms on the same post reading top to bottom left to right?

     

    Cheers,

     

    Rick

  16. Hi Jeremy,

     

    The yard is where it is because I’m loosely basing that end of the layout on Lairg.  So the station is a mash up of Dalwhinnie and Lairg in that respect.  From a model railway point of view I wanted to keep it fairly simple, but with enough operational interest to stop it becoming boring to play with.  I had wondered about whether 11 needed to be a main signal, or whether an advanced starter needed to be provided.  I think your suggestion of putting the points to the yard behind signal 4 makes more sense. 

     

    Below is a picture of Lairg.   The disc on the floor is the equivalent of my diagram's No.11, and the signal on the bracket is like my No.4.  I've never fully understood the Lairg signalling, because as you can see there's a main arm and a calling on arm, but I don't know the purpose of the calling on arm?  Is the calling on arm to allow a train to enter the block section for the purposes of a shunt only?  Or does it read to an advanced starter that is out of sight? 

    Lairg

     

    Cheers

     

    Rick

  17. Hi Nick,

     

    The reason 9 is a facing crossover is to allow a train to be held in the down platform and something else to overtake it via the up platform before going onto the single line, that is also why the up platform is signalled bidirectionally.  This seems to be the arrangement at Dalwhinnie.

     

    The trains terminating in the down platform would be freight destined for the yard, and have come from the direction of the single line (Inverness).  After running round they will shunt back out onto the single line and then propel into the yard from signal 16.  This is another reason to allow down trains to pass through the up line, so they can continue running past after a freight has arrived. 

     

    Does that make sense?  Do you still think 17 should be a main aspect?

     

    Thanks

     

    Rick 

  18. Hello,

     

    Reviving this old thread.  The layout has changed slightly, I decided to represent one of the places where the Highland Mainline goes from single to double track, rather than just having a passing loop on a single track line.  The fuel sidings are now accessed from the yard, so there is no longer a ground frame.  The double track is going to be absolute block with intermediate blocks between here and the next box.  The single track is going to be tokenless block.

     

    Braeintra.jpg.015f1334d3c4a30653589d3b02c24279.jpg

     

    Some notes to go with the diagram as I have drawn it.  20 lever frame.  The points at each end of the loop (9 and 15) are motored, and have only one lever to operate them, whereas the points into the yard are on rodding with an FPL and points lever (12/13).  No.11 is a yellow disc to allow movements up the yard headshunt when the points are normal.  The disc no.10 reads to the limit of shunt on the down line, for a loco to come off a train in the down platform, get behind no.3 signal and then run round through the up line.  One of the unused levers will be a shunt token release for shunting onto the single line.

     

    Does it look ok?  Is the signalling correct?  Does the numbering of the levers make sense?  As usual, any tips appreciated.

     

    Cheers

     

    Rick     

  19. Thanks again for the replies, the wealth of knowledge on the forum is great.   The photos and video of the locks and rotating contacts are brilliant Phil, and Mike's pictures of the locking frame under construction are a great help for what I'm hoping to replicate in the future.  

     

    I did a bit of research myself, armed with the knowledge from reading the replies on this thread, and came across this: https://www.festipedia.org.uk/wiki/S%26T_reference_folder_1969 which I found very helpful.  I feel like I've closed a gap in my understanding, so thanks again. 

     

    I'd like to make a miniature lever frame that is as close to scale model and operates as closely to the real thing as is realistically possible.  I was planning to use the MSE frame as a base, but I wonder if just the cast levers might be better, built into a scratchbuilt frame, or possibly the whole thing scratchbuilt?  Inevitably some things will be impossible to scale down; I think an overscale amount of movement will be necessary to make mechanical interlocking work properly for example.  That also makes me wonder if locking driven by the catch handle will be possible on a small scale due to it being such a small movement?  Has anyone tried or managed to make a small scale electric lock?  Or is there a suitable off the shelf item that could be used or adapted?  

     

    I'll have to do more research on the arrangement in the Highland Mainline boxes, I think a lot of them were modified by the LMS or BR, so probably don't have much of their original Highland Railway equimpent left.  

     

    Cheers

     

    Rick

×
×
  • Create New...