Hi all ..good day today, first 2 board frames finished ready for tops and pre-cut the 3rd board frames which is 4ft x 18" ready for tomorrow to put together,i also started cutting the 4th which will be a tapered board 3ft 3" long and 18" wide tapered to 12"...see how good my cuts will be there then! If i ever have to move the layout for some reason it can be dismantled, this is the first mistake i made with exe valley ,i had to demolish one board to move house... lesson learnt!
Here is the track plan so far, all points should miss the bracing and track board joins should fall on a plain piece of track... good ole anyrail!
The botom left two boards will be lift up sections as this is the door access and to the conservatory,seen a good hinge method on utube using kitchen door hinges so i might have a bash at that method.