Jump to content
 

86902

Members
  • Posts

    250
  • Joined

  • Last visited

Posts posted by 86902

  1. Really enjoyed the show, didn’t have issues with the heat affecting the layout as I built the layout in a warm shed, only issues I had were operators learning and the odd item of new stock not being run in enough before the show.

    The quality of layouts was very high although I didn’t get anywhere near enough time to look around.

    Superb effort from the DEMU team again, thanks for the opportunity.

    Kind regards

    Bob

  2. Plenty of stock repaints, kit builds etc in progress for the layout, some completing are 2 08-16 tampers in Balfour livery, EWS 37 faded and a old project, my repainted saloon started before Bachmann released it!

    Get there in the end!!

    post-22888-0-06433000-1527107468_thumb.jpeg

    post-22888-0-88443800-1527107485_thumb.jpeg

    post-22888-0-21576400-1527107507_thumb.jpeg

    post-22888-0-29942600-1527107529_thumb.jpeg

    • Like 8
    • Craftsmanship/clever 1
  3. I’ve completed another vehicle to sit on the road bridge, this is the stobart rail ballast under cutter or “gopher” loaded onto the oxford low loader.

    As the machine is supplied it’s in a on the track work pose, I hacked it about to load on the trailer.

    Scale model scenery ratchet straps were used, aswell as 1.6mm chain.

    All weathered in a sealed with satin varnish.

    Cheers

    Bob

     

    post-22888-0-18554300-1526857078_thumb.jpeg

    post-22888-0-10423400-1526857099_thumb.jpeg

    post-22888-0-16461100-1526857116_thumb.jpeg

    post-22888-0-99102100-1526857130_thumb.jpeg

    post-22888-0-02580200-1526857151_thumb.jpeg

    post-22888-0-19426600-1526857233_thumb.jpeg

    • Like 5
    • Informative/Useful 1
  4. More work carried out on the layout.

    Fitted a train tech welding module inside the shed ready for detailing in there, quite impressed with it as it’s controllable via the Dcc control aswell.

    Another van gets partial repaint and detailing, looks a lot better than out the box hopefully.

    More to come......

    Thanks

    Bob

     

    post-22888-0-62477200-1523172978_thumb.jpeg

    post-22888-0-67820000-1523172996_thumb.jpeg

    post-22888-0-28485100-1523173014_thumb.jpeg

    • Like 10
  5. Some of the cranes required for the layout are in slow build. These come from Make your Mark models and are superb, I’m slowly painting the pieces on the twin jib before lots of detailing can be added.

    Plan is for one of the twins, and 2 single jibs.

     

    post-22888-0-16938600-1516533383_thumb.jpeg

    post-22888-0-86877800-1516533396_thumb.jpeg

    post-22888-0-00819000-1516533421_thumb.jpeg

    post-22888-0-78664500-1516533438_thumb.jpeg

    • Like 14
×
×
  • Create New...