Quiet on Crook st. for a while, work has got in the way but managed to paint some figures up, then on Friday I had one of those I am not happy with the layout moments, I decided I would like a hard standing and maybe servicing depot, any way I went for the hard standing only has it would be difficult to fit it in and any way I was not starting to cut out inspection pits at this stage so then I decided to raise the level at the bottom end as well, yesterday was spent adding extra support in places and then playing with Neil,s [class 66] idea of the crayons for flower heads and litter, the Tesco bags are over scale but a bit of tweeking will sort that, today was fun time with plaster, managed to knock a jar of paint over the hard standing whilst painting the hard standing this caused me 30 mins. of excitement,
47, 25 and 40 share the stabling point between duties,
37 116 waits to move on to the fueling point,
37 and 25 share the head shunt,
The extent of the new work,
37 116 stabled on the head shunt,
Some debris has missed the bins,
Just like I remember,
These two are deciding if it is brew time yet,
These two have decided it is,
Thanks for looking hopefully I have managed to retain some of the atmosphere I was originally aiming for,
thanks for looking Steve.