Jump to content
 

crazynitwit

Members
  • Posts

    161
  • Joined

  • Last visited

Posts posted by crazynitwit

  1. Do you want chalk by rail either internal or mainline then what sort of wagons? Google Barrington Rugby Cement as they had Low height tipplers and associated wagon tippler. Tunnel had some iu wagons very similar to BR sand tipplers. Coal for the kilns either in hoppers or minerals so either another tippler or hopper house.

     

    A wagon repair siding and or shed plus somewhere to maintain and fuel the locomotives!

     

    Hornby are doing a Barrington Sentinel in the next batch!

    i believe they may have already brought it out as im pretty sure i saw one in a local model shop when i was buying a pca wagon.

  2. Halling in Kent might be worth a look - the actual bulk of the works was "off-scene" but there were a cluster of building at the rail terminal - also exported cement in Presflo's / Early powder tanks and bagged cement in the APCM PO vans too.

     

    or have a look at Northenden - not a cement works but a nice little cement terminal

    From looking at northenden I'm getting the impression that a cement terminal is just a point at which the cement and aggregates are mixed. Tell me if I'm wrong.

  3. Do you want chalk by rail either internal or mainline then what sort of wagons? Google Barrington Rugby Cement as they had Low height tipplers and associated wagon tippler. Tunnel had some iu wagons very similar to BR sand tipplers. Coal for the kilns either in hoppers or minerals so either another tippler or hopper house.

     

    A wagon repair siding and or shed plus somewhere to maintain and fuel the locomotives!

     

    Hornby are doing a Barrington Sentinel in the next batch!

    As I'm modelling a modern image layout would the kilns still be heated with coal or fuel. I already have a sentinel but another one can never hurt.

  4. Try looking up Dewsbury cemment terminal, still rail connected. Do you just want the cemment plant or you could incude a concrete batching and casting plant with associated aggregate storage and loading/unloading facility.

    I have a train that consists of one pca wagon and one mfa wagon for aggregates. So probably just the pca unloading points and aggregates storage.

  5. At BRM, we love building railway models. In this hobby, getting your hands dirty is a huge part of the fun. With that in mind, we thought it's time to run a model making competition. But one with a difference.

     

    We aren't asking anyone to build a layout. For most people that would be far too great an undertaking. We wanted something that was open to all. Something that wouldn't involve too much space, or time or cost.

     

    So, we invite you to take part on the first ever BRM cake box challenge.

     

    The rules are simple enough. Entrants must build a diorama that can fit in a standard 8-inch square cardboard cake box – the sort available from shops that sell cookery items. You don't display the model in the box (unless you want to) it's simply a guide to the maximum size, a bit like the cages you find at airports to show how large your suitcase can be.

     

    Your diorama can be any scale, any era, any prototype, in fact anything you like. The only condition is that it must include at least two railway related items. These could be anything you like, from locomotives to a tail lamp.

     

    Judging will be based on photos you supply which will be posted on RMweb. We'll ask you to provide a description with a brief idea how you made your model. The models will then be voted on by visitors to the forum this time next year. That way, an imaginative and appealing scene will stand as much chance of winning as the finest scale model with every rivet in place.

     

    We'll be doing our best to help you out with ideas and inspiration. On this months DVD I'll show that it would be possible to work in every scale from N to G. There is now an area on RMweb to discuss progress and swap ideas. We'll also be happy to take photos of your models at any of the BRM shows if you don't feel up to snapping them yourselves.

     

    The BRM team will be building their own scenes during the year and writing them up in the magazine. You can see our results at shows and tell us how you can do better!

     

     

    RMweb box.jpg

    More details, and the first Cake Box build are in the November 2017 issue of BRM.

    Do we post our pictures to this thread

×
×
  • Create New...