  1. On 11/11/2022 at 18:09, Donington Road said:

    This crossover has been built on-site over the last two nights.  It looks to be a replacement for the Down Fast and Up Fast ECML (top left).

    Is it unusual that the sleepers will span both tracks?

     

    IMG_4549c.jpg.27f36e79973759f195c4f22262c63e77.jpg

     

    Perhaps it provides a firmer base for the points etc by spreading the weight, stresses and strains?

     

     

     

     

     

     

    • Interesting/Thought-provoking 1
  2. On 22/10/2022 at 02:10, Crun said:

    Activity at the end of the road off Bretton Way. Taken at the entrance to the field adjacent to the ECML. There were metal beams next to the crane and a metal bridge.

     

    Lifting of concrete blocks:

    20221020_171628.jpg

     

    20221020_171740.jpg

     

    20221020_171746.jpg

     

    Views from the Cock Lane bridge:

    20221020_172026.jpg

     

    20221020_172452.jpg

     

    20221020_172650.jpg

     

    20221020_172702.jpg

     

    More images from today 26/10/2022. Looks like a new bridge is being constructed out of the box girders etc:

    20221026_165312.jpg

     

    20221026_165317.jpg

     

    20221026_165323.jpg

     

    20221026_165326.jpg

    • Like 4
  3. 2 hours ago, jamie92208 said:

    Are they by any chance starting to add portal beams to the OHLE to get rid of the troublesome headspans.

     

    Jamie

    Nothing seen stacked up next to the ECML. Only two or three from the orange army present by the distant  vans. The two machines could use the tracks if needs be. They both had wide bulldozer attachments on their fronts that I saw from the other side of the Cock Lane bridge.

    • Like 1
    • Informative/Useful 2
×
×