Photographs from Cock Lane Bridge of the dive under trenches. After taking these I had a look at the work under the A15 and was surprised to see two LNER Azumas pass in opposite directions on the GNGE lines.
I was told they thought Anglian Water had shut off the pipe when I went over and round the flood at around 16:15. To my inexpert eye and wet feet it will take a a good time to pump out the flood water before they can resume work next week.
I was told it happened around 2pm today. It was flowing like a mountain stream from somewhere near the new Lincoln Road bridge. Wall to wall muddy water!
Bad news about the footpath under the A15. A water main has burst and made passage, even by mountain bike, impossible. I had to cross the A15 and be let through a chained up gate after riding through the edge of the muddy flood.