Jump to content
 

Crun

Members
  • Posts

    937
  • Joined

  • Last visited

Everything posted by Crun

  1. More trains per hour: East Coast Main Line to get £350m for digital signal system https://www.bbc.co.uk/news/amp/uk-england-lincolnshire-53141103
  2. Saturday 13th June. Views of sheet piling, augers and excavations around the Cock Lane bridge area:
  3. Yes. No workers about in that area. Shovels etc also left in the open.
  4. Saturday 13th June the Lincoln Road A15 bridge in the Werrington end of the works. Views of the revealed reinforced concrete piles.
  5. A reply from another forum: Future of Rail | Curved box jack under East Coast Main Line junction - New Civil Engineer https://www.newcivilengineer.com/the-future-of/future-of-rail-curved-box-jack-takes-out-east-coast-main-line-junction-19-02-2020/ An informative article. Does anyone have a more specific explanation as to how the piling under the Cock Lane footbridge will be done given the reduced headroom under the new bridge?
  6. Can anyone please tell me how they do the sheet piling directly under the Cock Lane bridge?
  7. I had to use my work laptop with a fuller version of the relevant Adobe software to view and hear this. This was after downloading it and opening it in a long-winded fashion. No wonder they do the sheet piling overnight!
  8. I was using a laptop with old software on it. It works OK on my mobile and new laptop. Thanks
  9. Many thanks for your video Mick. I hope you enjoy filming more work close to Werrington in the future. We now have activity here and at the southern most part of the site.
×
×
  • Create New...