Jump to content
 

goatdriver

Members
  • Posts

    30
  • Joined

  • Last visited

Everything posted by goatdriver

  1. I'm building an OO layout using Peco code 75 flex track. Peco manufactures concrete sleeper code 75 turnouts, which I have on order. Unfortunately, the only code 75 double-slip they produce has wooden sleepers. Has anyone tried modifying their double-slip using their IL-121 concrete sleepers? I'd rather do that, if possible, than hand build the entire double-slip.
  2. My order has been pending (for items supposedly in stock) since 4 August. I finally gave up and emailed him today, cancelling the order.
  3. One typo in my previous post: I actually placed my order on 4 August, not October.
  4. I have an order with C&L that I placed on 4 October (for items listed as being in stock) still showing as pending. Being in the US, I'm not able to visit exhibitions in the UK. I've had only one response to the several emails I've sent asking for updates. I understand that running a one person operation is difficult, but at this point I'm frustrated. I have placed orders with other suppliers in the UK and usually receive the items within two weeks (via Royal Mail and US Mail).
×
×
  • Create New...