Jump to content
 

Philou

Members
  • Posts

    2,232
  • Joined

  • Last visited

Profile Information

  • Location
    : In the deepest, darkest Franche Comté, France
  • Interests
    00 gauge (GWR and BR(W)). Now in the process of creating a new railway room in an old barn after a wait of 40-odd years - the usual suspects - home, children etc. taking priority.

    You can follow progress here: https://www.rmweb.co.uk/community/index.php?/topic/165295-dymented-i-must-be/

Recent Profile Visitors

2,821 profile views

Philou's Achievements

6.7k

Reputation

  1. Thanks chaps @lezz01, @Andy Hayter and @Nick C for the advice. I do have a problem with stockings as they catch on my hairy legs and Mrs Philou doesn't wear any - prefers shorty socks ones as she's wears the trousers most of the time! The vacuum I have is a low powered Silvercrest one from Lidl - no good for domestic stuff, ideal for modelling. It's bagless so no need for any additional filtering (stockings/socks) and it did what I expected it to do - tipping the contents on the floor notwithstanding - I stood it up nozzle end down and it tipped over, d'oh! I did look at Jura-Modellisme straight away as it would have been a nice day out but they don't have stock of the particular combination size/colour that I wanted. However, my nephew-in-law is on his way to Newcastle-u-T and I've asked if he could pick up what I want in the UK in 1L volumes - if he's got room in his luggage. Otherwise I'll source it here in France (Amazon have some too but not the right combo either!). As I'm off to the club this pm, I doubt if I'll do an update this evening as not much is getting done this morning! Cheers everyone, Philip
  2. Another exciting day! Hello chums and chumesses, I did some static grass today - the bad news is I've run out and there are no local suppliers of which I'm aware around these parts. Good news is that tomorrow pm I'm going to the club where there's a Freemo exhibition set up with some German modellers that have brought their modules along. I shall get some addresses of local suppliers - no doubt Modellbahnlippe will be mentioned! I really want some bottles of assorted colours either from WW Scenics (based in Swansea) or Woodlands in various lengths. Do you want to see photos, do you, do you? Here we are: ^ This is my first attempt at flocking for me. I had some colour left over from yesterday to which I added some black acrylic giving me a rather dirty brown colour - just what I wanted. There was about two - three tablespoon's worth and I added a 40:60 water:PVA solution giving me a volume of the equivalent of half a yoghurt carton (no accurate measuring here - all done by eye). Working quickly, I liberally applied my dirty PVA mix over the lower backscene (not too much as the mix was quite runny) and then with the applicator I applied 3mm, 5mm and 10mm fibres in assorted greens - the 10mm being of a lighter hue. Once sprinkled to my satisfaction, I crossed over the trackbed and did the longer section adjoining the mainline, and finally ending up above the rockface and that's where I ran out of runny glue and fibres. Next time flocking, I'll dab a bit of PVA on a couple of the 'rock' outcrops of the rockface - nature does get everywhere! I am very very happy with the result despite there being a bit too much alongside the cess but that'll be scraped off eventually. As I coloured the PVA, even though I may have missed a bit or been a bit tight light with the fibre, it doesn't show. What's not to like? I passed a small 12v vacuum over it ready to recycle the excess. That was a palaver - had to find the vacuum that had been stored willy nilly on the earth floor of the barn (not me, guv') and then empty it of dust and dead spiders, clean the filter and container, dry it all and back into the barn asap. It worked straight away! Recovering from my surprise I then opened it up to retrieve the contents and promptly emptied it all on the floor - hey ho! All back in the vacuum and there it'll stay until I find a suitable container in which to store it ;)). What next? Back to the bridge as my rivet transfers have arrived but I have no base coat with which to paint the bridge - my local hardware store had all the colours of spray that you could possibly want except grey primer - another hey ho! However, all my transoms are cut and holes drilled in the baulks in which to place them. I shall start putting the bridge chairs in place tomorrow before I go to the club in the afternoon. Cheers everyone and keep smiling as another weekend is just around the corner! Philip
  3. ^ Those are the gantries to which I refered and they extend over the Valleys Line beyond the Bute Street bridge. However, I hadn't realised there was a rigidly defined frontier between NR and TfW. Banging and heads springs to mind. I do hope the OLE will get to Queen Street and Bute Road at the very least. So much for the green credentials of HMG. Cheers, Philip
  4. @Hogan22 Just as a thought - is your track ballasted? It only needs a bit of ballast or a drop of PVA to either stop the blades from throwing or gumming up the tie-rods. Been there, done that! Cheers, Philip
  5. I took some pictures with a different camera and no flash - it makes a difference: ^ This is the colour I should have liked for the print-your-own building papers as it reminds me of Raglan stone, but it wasn't to be. Looks less like bark in this shade! Cheers, Philip
  6. Hello chaps and chapesses, Out came the acrylics this morning and the rock face was given a going over - I'm quite happy with the result. I'm letting it dry out completely for the rest of the afternoon as there were one or two patches of white dribble that hadn't completely dried overnight due to puddling and it being very cold in the barn. It didn't stop the colouring being done: ^ The flash has washed out the colour a little as it has a slightly redder hue - the photos make it look just like - well - er - tree bark. I'll try without the flash and post up again later. The flash has also lit up the darkest recesses showing the unpainted polystyrene behind, but under normal viewing conditions you can't see it. Next step: The timber baulks for the bridge have been cut to size and I shall amuse myself this afternoon marking out for the transoms and the spacings for the baulk chairs. I haven't yet received the rivets so I'll have to wait until there done before the baulks themselves are fixed to the deck (easier to apply the transfers). It'll also give me time to dig out my rollaguage that I acquired years ago - I know it's not fine enough for Code 75 but I should like it as a third hand/back up. More later, Philip
  7. It's all looking good @br2975. Can't understand why they're not doing the OLE through Cardiff Central - can't be more complex than at Radyr AND the GWML electrification helped a bit Queen Street end by the huuuuuuuuuuuuge gantries that stretch over the SWML and the Valleys Line. Cheers, Philip
  8. MY WRINKLY BOTTOM COVERED IN SNOW!! Hello chums and chumesses, As the headline suggests, the PVA had dried out overnight leaving a surprisingly hard crust on the 'styrene and out came the white paint and several hours later - ta daa: ^ Here we are - all the background 'styrene and the part to the right of Dymented, plus the bark have been 'blanked' out. The only casualty was a bit of the bridge retaining wall got a touch of white on it despite having a paint guard. I'll wait until the acrylics have been done on the rock face (just in case!) and a bit of colouring or a piece of printed engineering brickwork will mask it. As the crust of paper plus PVA is very firm, I'm going to cut out the plastering part - no point really as there's no infilling to be done and what has been now painted, will be covered in flock and other materials. Definitely motoring at the moment and I shall continue to do as much as possible over the next few days. Toodle pip, Philip
  9. Ooer - my apologies to both @martin_wynne and @Wayne Kinney for getting BOTH your names wrong/back-to-front (blushes furiously) - nearly, but definitely NO cigar. Onto today which was yesterday's tomorrow. You've probably all heard of Crinkly Bottom? Well, here's Wrinkly Bottom: ^ Aaww c'mon Philou, you're mucking about. Well, as you can see I've dismantled the mainline (again!) and I've done some papering. I did one layer of kitchen roll wetted in situ with PVA yesterday and a second layer today criss-crossing the earlier one over most of the 'styrene. I said Wrinkly Bottom* as the kitchen roll has dried wrinkly, but I'm not bothered about that as flock and other scenic materials will hide it all. I haven't done the hillock between Dymented storage yard and the operating well as I'll probably need to lift it out, and also the storage yard, so I can start painting everything white once the PVA has fully dried. Once the white paint has dried then it'll be a case of getting the acrylics out and colouring the rock face. When done, I shall do all the back scene of Dymented in various flocks - just hope I've enough to make a decent start! Following all of that THEN I shall lay the branchline in the cutting and ballast it. Once I'm happy with that, then the mainline can go back in place with the skew bridge and the track laid and ballasted there as well. I shall then move into the station area itself. I can't get too ahead of myself as I'll need to acquire some point motors in due course and have the holes cut for those as well before any permanent fixing and ballasting - so much to remember and in the right order!! It's all going well at the moment - just hope not too well ................. *Wrinkly Bottom - I like that as a name. Should I change Dymented to that? Cheers everyone and probably more tomorrow, Philip
  10. @lezz01 Ooh! You seem to have boxes of useful bits and bobs! I've never used SMP though I've heard a lot about it. I could make use of it as I said in the yards, but there is a section of track through Ledbury station where the Up is flatbottomed and the Down bullhead and still is today). Now that would really be 'as is'. My brother is due over at the end of the month (he of Lord and Butler of Cardiff). Now, if it was sent to him, he could bring it with him together with some other bits that I've pre-ordered. I'll clear it with him and get back to you on that - thank you. I'll have an EM template copy please - one question though - is it GWR? I ask because the Big Four didn't do things quite the same. I'm still not going to say what it was I did today until tomorrow - but the skew bridge is now 'finished' regarding cranks and angles and I await the transfers before painting and glueing - so a few days wait to completion - just as well when I reveal all tomorrow (and no, it wasn't track laying) ;)). Cheers, Philip
  11. @lezz01 I hope you won't think too badly of me, but it's RTP (ready to plonk) track - flat bottomed Code 75 from Peco. Bullhead would have been good for the goods yards at Pontrilas and Ledbury, unfortunately that boat sailed ages ago as I'd bought all my rail before the bullhead was announced. I've got about 150yds of track and 68 points to lay and whilst hand built pointwork would have been most excellent, I feel time isn't on my side and I would become quickly frustrated if I didn't construct the first point perfectly. I've been looking at the Templot programme together with the British Finetrax pointwork (from the two Wynnes), but I'd have to redo all my drawing for the pointwork and there'd be a learning curve for both. However, I have seen how to 'flex' Peco pointwork to achieve better flow through junctions AND I did see somewhere (perhaps on RMWeb - though I can't remember clearly) drawings showing proper sleeper spacing when doing 60 foot panels. I could be tempted by that to make the trackwork less 'samey'. A sharp craft knife and a simple jig would sort that out. No photo today, but I have been extremely occupied - I'll tell you all tomorrow ;))). Cheers, Philip
  12. Hello chums and chumesses, What a constrast between two days! Despite the cold I cracked on and I really got to grips with the 'styrene and save some tidying up (tiny infills and the like), the area around Dymented is done. I even got the plywood base and track bed back in place and so we have some photos especially for @Barclay - yay! I also managed to do a panorama but as it looks odd, I've also taken some 'normal' ones - here goes: ^ Here you have it in its full glory. From the extreme left we have Ledbury viaduct with the Rule 1 branch behind, that arrives at Dymented via an underbridge (middle left). This is where the skew bridge will go when completed. Above, on the viaduct, is the main through line (Ledbury to Pontrilas). The left hand part of the viaduct remains to be decorated. The green area in front of it is a small holding area for branch line stock. The central area is Dymented station - I have prepared the cut-outs ready for the platforms and a small goods platform in the front. Despite the rather short look, the station platform is over 1.4m in length overall. Towards the front edge will be an industrial building - what exactly, I haven't yet decided - but it won't be dairy. Either a mineral bottling plant (shades of Colwall and the Malvern Spring Water plant) or some form of industrial use requiring chemicals originating from the Chemical Works at Pontrilas. The headshunt to serve both the works and the goods shed will form part of the storage area. To the right of the station area is another headshunt with perhaps a coal depot at its far end. In between this and the mainline beyond, is the branchline rising up to meet the mainline on the right (out of picture). The retaining walls need cutting out and finishing along the main and branch line. On the far right, you can see the rising hill with the roadbridge acting as a visual break between Dymented and Pontrilas. Below are the 'normal' pictures in the same left to right order: Much remains to be done in terms of landscaping, but I can reach the far side using a hop-up so it shouldn't be too much of a task. I must confess having seen the track-bed in place, I was very tempted to say 'Buggrit' and start laying some track! I will be patient and do the dirty stuff first and then have a nice clean area upon which to commence track-laying. All in all, a very fruitful day. Cheers, Philip
  13. I would send Rails an e-mail with your old Hattons order number, if you had one, and include the stock details. I did one in early February to them and got confirmation that the order was set up within a day or so (wasn't for coaches). Cheers, Philip
  14. Hello chaps and chapesses, I was right about not a lot getting done today - bit of a washout, especially as it's cold and wet and it wasn't at all inviting in the barn. I managed to get a bit of 'styrene in place before it was time for the 'air cut. I have done the yard area on the Pontrilas side of Dymented. Tomorrow I have a whole day of modelling ahead and the intention is to do some trimming of the ply that I had done towards the storage sidings (Ledbury direction) and have the 'styrene glued and trimmed there as well. If it all goes well, I may get to finish the whole of the Dymented area. I'll then take a photo of the working area as soon as the track-bed is in place. Definitely more tomorrow, Cheers, Philip
  15. Hello chums and chumesses, Good progress was made regarding the 'styrene. I am all the way back to Dymented and all shaped and glued. A smidge to be completed tomorrow morning in the station yard area and the trackbed can be made good - perhaps @Barclay won't have to wait too long for his photo! I've also done the last 12 cranks on the skew bridge and just waiting for them to set fully before trimming and sanding back. Rivets are ordered and should be on their way soon. Tomorrow has become a 'Oi! Get yer 'air cut!' day so modelling time will be restricted in the afternoon, but I am hoping to get the baulks cut to size and start glueing the chairs in place in the next day or so. Bridge decorating will go hand-in-hand with the aforementioned. Quite chuffed really and despite the cold I got more done than anticipated. More tomorrow, Cheers, Philip
×
×
  • Create New...