Good morning, after some stop and starting on the main lines, I’ve decided to start work on the Colliery Yard, the first two sidings at first as some more points are required as well as track pins and fish plates.
The siding nearest to the shed with the 3x 16ton mineral wagons on is to form a loop so the Coal Board engines can run around their train. This is made up of Peco Flexi-track while the two sidings to the rear of the water tower are peco set track lengths.
More updates to follow when some more parts have been acquired.