Jump to content
 

Savoyard

RMweb Gold
  • Posts

    873
  • Joined

  • Last visited

Posts posted by Savoyard

  1. Rod,

     

    How about the Cobalt SS point motors, they are small and can be surface mounted. I think I may have some so I will investigate them tomorrow and give you some feed back.

     

    Like Simon I am not in favour of Servo's, a friend swears by them but the amount of noise they can make I'd be swearing at them! :D

     

    Peter

     

     

     

    • Like 1
    • Thanks 1
  2. HI Rod,

     

    I must admit I was wondering about the Dapol/Lionheart but they have plastic sides and I believe are thicker sides and the windows on plastic models never look quite right, so I decided to stay with Dartstead and their brass sides.

     

    I know this next bit may mean I have to seek medical help but I bought three more Mk 1's but in Western Region Chocolate and Cream on Monday whilst visiting Ellis Clarke Trains in Skipton.

     

    IMG_7242c50pc.jpg.91705d3ebdb9330f1a9daa9af82a4327.jpg

     

    These new Mk 1's are an improvement on my original Darstead Blood and Custard Mk 1's. They have improved detailing around the windows including beading, the two pictures illustrate this.

    IMG_7247c50pc.jpg.2ab9a4e8e30c11d224362132da25f0d4.jpg

    IMG_7246c50pc.jpg.03e9998b1f7aecc258e152eb42efe080.jpg

     

    I have a rake of four Bachmann Brassworks Maroon Mk 1's which I now want to replace with the similar Darstead coaches.

     

  3. After a couple of days working on the new three way point and the track around it, I had a tidy up and found I have a desk which has space! The new 3 way works OK a couple of running problems but I am sure these will be easily ironed out.

     

    I had a running session and ran a rake of my six Darstead Blood and Custard Mk 1's, this is the first time I had run them all together. I was pleasantly surprised that the station and the passing loop easily accommodated the loco and six coaches.

     

    IMG_7215r35pc.jpg.d820593e65fe4272eb7216c257f005a1.jpg

     

    IMG_7220c50pc.jpg.98b626ecf6185f387c0d8266074ddfe6.jpg


    The new three way gives an extra couple of inches or so on the outside road it can easily accommodate a six coach rake. 

     

    The other end of the passing loop showing the new 3 way point (again! :D)

     

    IMG_7222c50pc.jpg.0e1a0609dfa779be5c236b1bb4fba8d4.jpg

     

    The passing loop gives more operation flexibility and freight can operate between the two goods yards whilst passenger trains are parked in either the passing loop or the station, the back road off the three way can be used for holding the passenger stock that will use the run round side of the station.  I think the layout as it now is will give a lot of running options, that is if I can stop trying out new ideas like magnetic couplings and tie bars! :lol:

    • Like 10
  4. I finally got round to building the Greenwood Model Railway three way point and it is now on the layout and works quite well, it will probably need some further tweaking but without that it stock runs a lot better over it.

     

    IMG_7211c50pc.jpg.2f00586d8514eb8b4a35e889cdf250aa.jpg

    IMG_7212c50pc.jpg.80502a784ec4f90465856a4b25753abe.jpg

    IMG_7213c50pc.jpg.7935595aa198600a79946185a2ef70ae.jpg

     

    I have used the tie bar method on this point as on my PECO conversions. I have some track work to finish and taken the opportunity to realign the back two lines off the three way which should all be done by the evening.

     

    On the PECO point conversions I have decided to use PECO Individually replacement sleepers instead of modifying the box sleepers, once they have arrived I will complete the conversions of all the points.

     

     

    • Like 11
    • Agree 2
  5. I decided to put longer blades on the three way using blades from another kit I had spare, I reduced the size of the frog by two sleepers and this gives a better anchor for the shortest blade.

     

    Here is the finished point in place with the modified tie bars on both points.

     

    IMG_7211c50pc.jpg.bbf86eaa5ed662f82e48ff021ef38bbb.jpg

     

    It is now in place on the layout and I have been testing it and it seems to be working quite reasonably it just needs some fine tuning but it is still better than the previous Marcway three way.

     

    I have halted conversion on the other points whilst I wait for some PECO Individulay sleepers to arrive from Kernow Models to arrive and I will re do the existing conversions with the sleepers to avoid all that filling and filing, it will also make the rest of the conversion easier.

     

    I just have some track to finish off as I had to relay the track around the new point and tonight I might actually do something unusual and run some trains! :D

    • Like 3
    • Round of applause 1
  6. ThreeWay50pc2.jpg.36d83246843190c7884de619830bb4d1.jpg

     

    Having looked at the three way, I am considering cutting the pre-built frog section after the second sleeper from the left, this will give the smallest blade a decent anchor point.

     

    Having weighed up the options on the second prototype I think I'll revert back to the original, there is a danger of making what was meant to be a fairly simple modification to improve the appearance into something more complex and will still be a compromise.

     

    • Like 1
  7. I must admit John I did consider that but went for the complicated option, back to the drawing board! :lol:

     

    I am pleased with the 3 way point and that short blade is a problem, I also bought a normal point so I will probably redo that area with track from that point. The frogs come ready built so I just built around them but the point blade needs at least a couple more chairs, so another back to the drawing board!

     

     

  8.  

    27 minutes ago, doilum said:

    In a perfect world, should the sleepers either side of the tie bar be closer together and/ or of thicker timber? Not a criticism of the preceding work but getting the most out of a budget point.

     

    I was wondering what the spacing should be but it seems PECO points are a real compromise in a lot of areas it's knowing when to stop tweaking them without more or less building it from scratch.

     

    I must admit whilst the last mod improves the look even more, on reflection I am not sure I want to be moving all the point motors on my shed layout to accommodate the mod as the original mod gives a reasonable look for what I need, if I was starting again I would probably do a lot more.

     

  9. I wish people would stop giving me ideas! :lol:

     

    John would something like this look better.

     

    IMG_7185c25pc.jpg.d251cadef6dceae2c95d8c51007c3254.jpg

     

    I took out one sleeper at the end and moved them down and spaced them out a little.

     

    I must admit I was wondering about this the other day after building the Greenwood Model Railway three way point which I have nearly completed to replace a Marcway three way.

     

    ThreeWay50pc.jpg.8facae29ca29ea5fa6a65b00c9aed94c.jpg

     

    On this one I will keep the original tie bar in the middle but use my version on the end.

     

     

    • Like 3
  10. I tried a different method for the sleepers between the tie bars, instead of trimming the existing sleepers I used sleepers from scrap pieces of track. Here is the method I used.

     

    Firstly I trimmed the sleepers

     

    IMG_7176c50pc.jpg.d9f2fe2daff01325c2f19351fcc25ee2.jpg

     

     

    I trimmed just one part of the original sleeper which will need filling. I removed the existing chairs on the donor sleepers.

    IMG_7178c50pc.jpg.a309b0f05499fa42df0d4ce6094255f6.jpg

     

     

    I then glued the PECO replacement chairs to the donor sleepers.

    IMG_7179c50pc.jpg.c08a0e8bb23ba322d85177fc7e534e7c.jpg

     

     

    The result looks a lot better.

    IMG_7180c50pc.jpg.801966b1c1e0848b341d4001f77b7ef0.jpg

     

    And with the tie bars fitted.

    IMG_7182c50pc.jpg.673cb13c694cb17c7fff63eb170c6831.jpg

     

    I will use this method from now on, I may even redo the existing conversions.

    • Like 1
    • Craftsmanship/clever 1
  11. I have doing various work on the layout.

     

    I am still waiting for the motor for the turntable but I've added the rails on the bridge.

     

    475524933_IMG_7168c50pc(Copy).jpg.ab195e602b8d097651aa39da51f71d06.jpg

     

    I started work on the replacement three way point from Greenwood Model Railways. I needed some details to do the point blades which I got today so I should be able to finish that tomorrow, here is the work so far.

     

    207893842_IMG_7166c50pc(Copy).jpg.b57a345fba2caef76d2a6b1d9e891046.jpg 

     

     

    There is a thread on the Gauge O Guild Forum about improving PECO points and came up with the following using double sided copper clad and a couple of pins, The photo shows a before and after.

     

    1716087111_IMG_7112(Copy).jpg.18b07f1a80bfa5af42e4767ecc337ddd.jpg 

     

     

    I've done some minor tweaks increasing the space between the point blades from 28 mm to 29 mm and drilled a hole in the centre for the wire from the SMAIL point motor.

     

    The original conversion was on an older PECO point the one below is a current point with the box over the tie bar so I removed this and filled in the gaps with pieces of sleepers, with some weathering it will hide the joins.

     

    452510216_IMG_7163c50pc(Copy).jpg.ce28c81696f68f21318700c08d7840f5.jpg

     

    I will do a seperate thread on the conversion.

    • Like 1
    • Informative/Useful 1
  12. Julian,

     

    Apologies for not replying sooner. Whilst the points are DCC friendly I didn't want to rely on the point blades for the correct polarity on the frogs so I modified the points in a similar way to the Peco points and use one of the switches on the SMAIL to switch the polarity. I will take some better pictures to show the mods better and post them on here.

     

    Whilst the Marcway points are nicely made I found using them with slow motion points not ideal as soon as the point motor hits resistance it stalls, so it took a lot of tweaking to can them working but them I ran into other problems so I decided to use a Greenwood Model Railway 3 way point instead, which I am part way through building at the moment and I hope to have it completed and installed early this week.

     

    Peter

    • Thanks 1
    • Friendly/supportive 1
  13. There has not been much activity on the layout building over the last few weeks but the last two days I installed the turntable and wired it up. The bridge still needs to be finished which I will do once I've got the motor and tested it.

     

    IMG_7047c.jpg.36545e824ac55e46f589cd22f2aaef28.jpg

     

     

    • Like 4
    • Craftsmanship/clever 1
  14. I've not really done much on the layout over the last month or so with holidays and a site visit to Ramchester over the Bank Holiday, a truly inspiring layout, well done Rod and Howard.

     

    I have been tinkering with some ideas and this last weekend I finalised these.

     

    Firstly the station area, the track layout for this has changed slightly and I've made a mock of the station platforms, the station building has been borrowed from another layout.

     

    20200914_001.jpg.fe1f52ae1b0025df0e435e65b175d940.jpg

     

    20200914_002.jpg.8d32563d05234c7130f9d136eb3b9b3f.jpg

     

    20200914_003.jpg.9fe1a8459e5fc08e067a1d6ea6b1ccea.jpg

     

    20200914_004.jpg.331d5facf55ec5398a49fe3cbd9e787e.jpg

     

    The next area which has been modified is the engine shed and turntable area, I've changed the position of the turntable so that there is a bigger gap between it and the main line. Here is a mock up.

     

    20200914_005.jpg.60cac2025e4f4dfadf32ee0aa1f830fb.jpg

     

    I will hopefully have Greenwood Model Railway turntable built and fitted soon.

     

    20200914_006.jpg.6d4ca00dd15d2a6f7c5baa57b6ebf170.jpg

     

     

    Over the weekend I decided to try and incorporate a passing loop to improve the operational flexibility and after a mock up I purchased another Peco RH curved point and relaid the track and it all works quite nicely.

     

    20200914_007.jpg.f00308b151f498f2b4afdf60fdadc3da.jpg

    20200914_008.jpg.68df8297e8dd0a9ec26f5c1f718a3984.jpg

    20200914_009.jpg.b7195f7c3cbc185899609db4ad966cf4.jpg

     

    This area was originally going to be the fiddle yard but I've decided to make it scenic and it will be another goods yard. I've also changed the track layout at the other end of this area as shown here.

     

    20200914_010.jpg.dab62f73549c80549f7e3ad4830d77ef.jpg

     

    I have decided not to use the Marcway points on the layout as I had to do a lot of modification to the three way point to get it to work with a SMAIL point motor, this will be replaced by a Greenwood Model Railway three way once I've built it.

     

    Here is the Marcway three way showing the mods I had to make to get it to work and it still has running problems with some stock.

     

    20200914_011.jpg.40a11d8cb2914ffe43e16a4af0a733ad.jpg

     

     

    I am waiting for some more SMAILS and once these have arrived I will wire up the new Goods/Fiddle Yard area.

       

    • Like 6
  15. Thanks Rod and glad to hear you got it sorted, the joys of model railways. The Patriot has been running OK tonight, I am just repairing the links on two of the coaches.

     

    I fitted some lights to the Class 101 using some Digirails OO Gauge light bars, it seems OK except for a drop on the trailer car which I will investigate further. I would also like to add directional lighting though the access to the cab area is not easy so I will give it some thought/

     

    IMG_6682cr40pc.jpg.4da18bb5d4b725ca6fde2038e4adf116.jpg

    • Like 10
  16. 31 minutes ago, railwayrod said:

    Nice video Peter.

     

    Rod

    Glad you like it, I'll post a couple of the other after I've checked them.

     

    You'll be pleased to know you have been passed out on TouchCab! :D

     

    My visit certainly gave me a lot to think about for my layout and the first thing I thought I'd try is banking the curves using the thin cork, it seems to look OK.

     

    IMG_6679cr40pc.jpg.09e562ce721e498de673c36466cf8ae5.jpg

     

    • Like 3
  17. Hi Rod,

     

    It's a Bachmann Brassworks Class 101 fitted with a YouChoos Class 105 sound chip and I think that is where the confusion came in. I was going to post something last night but the journey home caught up with me and sleep won instead.

     

    I am going to sort out the pics later including the video of you controlling the 101 with TouchCab.

     

    Peter

     

     

    • Thanks 1
  18. Rob, 

     

    Thank you for a great time and your kind hospitality, I really enjoyed seeing Ramchester for real what a cracking layout and a standard I aspire to for my layout. I am pleased to have introduced you to wireless control and I am sure will increase the pleasure operating Ramchester.

     

    I will post the pics when I get back home as it is not easy on my iPad.

     

    Thanks once again,

     

    Peter

    • Thanks 1
  19. I have been experimenting further with the magnetic coupling ideas, I have modified my original idea to use a more powerful 3 x 2 mm magnet, the original was 3 x 1 mm.

    I have moved the magnet to the third link to avoid potential buffer lock on my slightly tighter curves, the third link is also slightly wider to accommodate the 3 mm wide magnet.

    I kept the original screw link connection between the loco and the first coach.


    Here is a new test video using five coaches.

     

     

    PLEASE NOTE: The original video was corrupted so I reloaded it this afternoon.

     

    I am using a slightly different method on the wagons based on a suggestion by Andrew Booth. I will be testing this a further before I do a video.

     

×
×
  • Create New...