Jump to content
 

pendlerail

Members
  • Posts

    432
  • Joined

  • Last visited

Posts posted by pendlerail

  1. 20200321_113647.jpg.cff0d3832e6cb44af7661fdb58f359e8.jpg20200324_133117.jpg.4867acc519f2f50de654546ec6e10319.jpg

    Long time no post, things have been happening on Logandale, 

    New Signals have arrived, after a remodel of the sidings!

    20200327_155309.jpg.44874434dfd6314c723a4ca444b4f09c.jpg

    Scenic details are starting to appear like Balast and and Buildings 

    20200402_122749.jpg.f1b0362bb7ef4541a77e3855c6e24fbe.jpg

    And Here 26010 arrives with the coal empties from Ayr, for the local freight depot,

    • Like 2
  2. Only certain trains won't be controlled by the App, The phone in question is only used with the DR5000, the home network has been deleted,

    most trains work fine, it is just a few that it will not accept, my Wireless Maus also will not accept them, I fear it is a brand of decoder that will not work with the system, as some of them are hard wired in! but I am sure they have worked previously,

    so not a wi fi issue, I am afraid,

    Thanks

  3. Hi all, I run my layout with DR5000 and the Z21 app, and today I will not accept certain addresses as Locos?

    when I enter them it will not allow me to change direction or move them, the same applies with my wireless maus,

    they are entered into the library as locos, they are not in some small address range, so far have found -

    73, 90, 6441, 6800,

    other locos I try work perfectly,

    Can anyone help?

    Phil

  4. 719503832_Finalplan1.jpg.2740ff3613410f773e5f91701d3c133d.jpg

    now all my track has been laid. My attentions now move to signalling.

    Period is Late 80s early 90s the fiddle yard is on the left.

    I expect a signal to exit the sidings at the top with some sort of shunt signal.

    The right side of the plan the far right is a platform. And it's former yard and goods shed has been repurposed as a wagon works. 

    I would like working signals but not up to scratch building them. 

    Semaphore or colour lights.

    Thoughts are signal with shunt signal on approach, exit to stabling point at top of layout and exit to station yard.

    And a starting signal for platform?

    Does that sound right?

    Thanks in advance

    Phil 

  5. The next question is one of signalling.

    Late 80s early 90s is the period. The depot plan has changed slightly but don't expect much if any signals in there. Maybe just on the head shunt and maybe leading on to the head shunt.

    Any Ideas? 

    I will also start a thread on the signalling side of the forum.

    Thanks Phil 

  6. Track laying nearly completed.

    Made a senic purchase today20190820_150750.jpg.dc560f254131dfcc60cdd5e8b5b77a47.jpg

    Not the fueling point the servicing point. Thinking of running a line between the servicing point and fueling point. But would both have been there? 

    Tank unloading would be on the unconected line in front 

    20190819_183011.jpg.cf7d58b492c98bde72333315bd5588ce.jpg

    This is the complicated trackwork at the Depot/Station/Yard entrance.

    Happy so far 

    • Like 2
    • Craftsmanship/clever 1
×
×
  • Create New...