Jump to content
 

Gloucester Road

Members
  • Posts

    1,812
  • Joined

  • Last visited

Everything posted by Gloucester Road

  1. Due to a failure of the platform foundations and subsequent rebuilding, services to or through Gloucester Road were terminated.
  2. now with a DCC chip installed, 33114 waits for a driver
  3. 47581 was coming off the branch line to the TMD having picked up the fuel delivery
  4. something in the stacking process really set off the lights
  5. 37409 had to sub infor the usually booked Freighliner 66 (DC only)delivering PCA wagons. Need to pluck up courage and figute how to hard wire a few DCC chips into locos.
×
×
  • Create New...