As promised, some more images of the baseboard phase of Loftus Road.
Follwing Pete Hollman, Mike Denwood and Mark Butcher working out the ways to maximise the fiddle yard, here is the first plan for the new sections:
and here is the way we intend to transfer the same plan to the other end of the yard. Good old-fashioned tracing paper to copy the routes and then turned over to make sure that everything is facing the right way round.
.
In addition, as Loftus Road uses DCC to control the trains, we have decided to create power sections. This will be done using a Digitrax PM42 power management system, that allows us to set up four separate power districts. As we use Lenz DCC for controlling LR, we will not be using the additional functionality of feedback, although we have considered this! Attached to the bottom of the PM42 is a simpler way of connecting the DCC to each district and comes from LWH3 purchased from CoastalDCC. Much easier than trying to solder to 40+ connections!
That's all for now folks - hopefully next week, corking the baseboards!