First move under power
Afternoon
I've been wiring. I'd forgotten how long it takes and just how many mistakes you can make along the way!
But on the plus side, I now have the first board powered up and working. The only track left to build is the run off to the (as yet unconstructed fiddle yard). It's on DC at the moment but wire sized and installed for eventual DCC.
The water works siding is in and you can see the prairie shuffling back and forwards on the attached video. I'm not turning the board over yet to photograph as it's all a bit untidy. I do admire those that produce beautifully neat wiring looms. I don't ever seem to manage it.
There's a bridge to add along with a stone loading point on this board in the foreground (in mock up at least) before I work back towards the station, wiring each board in turn. Still, at least I can start to play trains!
- 10
5 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now